Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 26, 2023 at 8:00 PM
Updated January 26, 2024
Remodeling of a medical facility in San Jose, California. Completed plans call for the remodel of a 4,239-square-foot, two-story above grade medical facility.
Q & A deadline: April 24, 2023, 6:30:00 PM EDT For VMC-OCH Infusion Center Remodel, 263-CP23021, located at O'Connor Hospital, 2105 Forest Ave., San Jose, CA, 95128, in accordance with Bid Documents on file for the Work in the Office of the Clerk of the Board of Supervisors. Failure to specify the exact address may result in the Clerk of the Board of Supervisors not receiving the bid, or not receiving the bid by the deadline. All bids must be in the possession of the Clerk of the Board of Supervisors by the specified deadline. The Work will consist of: Change of use - The purpose of the project is to increase the capacity of the existing infusion center by repurposing a previous (not in use) ambulatory surgery unit, to accommodate growth in the volume of scheduled procedures per week. The new tenant improvements require minor demolition of existing conditions due to new floor plan layout for infusion center department. Scope of work includes but is not limited to modification to new interior walls, door/frames, ceiling and finishes, compliance with current life safety codes and modification to building systems (HVAC, electrical, lighting, plumbing and associated systems) will be needed due to new floor plan layout. Project does not include modifications to the exterior building envelop or building structural system. The project includes modifications to the fire sprinkler system and fire alarm system. Modifications of these systems shall be the responsibility of the contractor's licensed design build subcontractors. The project includes modifications to the fire sprinkler system and fire alarm system. Modifications of these systems shall be the responsibility of the contractor’s licensed designbuild subcontractors. Bid Bond: 10% Performance Bond: 100% Payment Bond: 100% The Contract Time for the completion of all the Work of the Project is 276 calendar Days from the Commencement Date in Owner's Notice to Proceed. Designated portions of the Work must be completed according to the following Milestones: 1. Contractor shall achieve Substantial Completion of the entire Work no later than 251 Days from the Commencement Date. 2. Contractor shall achieve Final Completion of the entire Work no later than 276 Days from the Commencement Date.
Award
Medical
$1,008,000.00
Public - County
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2023
July 3, 2023
2105 Forest Ave, San Jose, CA
Related To This Project
San Jose, CA
Bid Date: May 11 2023
San Jose, CA
--
San Jose, CA
--
San Jose, CA
Bid Date: Mar 03 2023
San Jose, CA
Bid Date: Feb 24 2023
San Jose, CA
Bid Date: Feb 22 2023
San Jose, CA
Bid Date: Jun 26 2020
San Jose, CA
Bid Date: Oct 16 2020
San Jose, CA
Bid Date: Mar 01 2023
San Jose, CA
Bid Date: Jan 31 2023
San Jose, CA
--
San Jose, CA
Bid Date: Jan 31 2023
San Jose, CA
Bid Date: Jan 19 2023
San Jose, CA
Bid Date: Jan 27 2023
San Jose, CA
Bid Date: Jan 25 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed