Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 22, 2024 at 8:00 PM
Updated March 23, 2024
Renovation of an educational facility in Bell Gardens, California. Completed plans call for the renovation of a educational facility.
Roof Restore/Repairs/Replacement at Bell Gardens High School This project is sublect to the enforcement of the DLSE PWR Monitoring/Enforcement by the Department of Industrial Relations (DIR), Division of Labor Standards Enforcement Pursuant to Labor Code 1771. Required Licenses: A, B or C39. Please be advised that this and all public works projects are subject to SB 854 DIR Contractor Registration DLSE Prevailing Wage Rate Enforcement & Monitoring. As of March 1, 2015, bids cannot be accepted nor any contract or subcontract entered into without proof that the contractor and all subcontractors are registered, Scope- The scope of work outlined in these documents is a summary of the work to be performed and executed by the contractor. For complete details of the scope of work refer to all parts of the construction/bid documents including the following, plans, specifications and all codes and standards referred to in the bid documents and governed by local standards. In short, the work will comprise, but is not limited to: Replace/Restore/Repair the roofs, rooftop first responders labeling, and rain gutter/down spouts replacement per Tremco's specs and remove and replace all fascia board at Bell Gardens High School. The terms of this Hazardous Material provision shall survive the completion of the work and/or any termination of this contract. If the environmental spec or survey for a building or area is not provided, the building or area is to be assume positive of hazardous materials. Critical containment to be installed inside classrooms/offices or buildings if the roof is being replaced or repaired. Abatement work to be done on non-school days, weekends or after school hours. All new fascia board to be premium KD Hem-Fir, primed and two coats of finish paint using Dunn Edwards product or equal to. Start of Construction: June 10, 2024 (Monday) A total of 56 consecutive calendar days of contract period
Bid Results
Educational
$3,380,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
