BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Asheville, North Carolina. Working plans call for the renovation of a educational facility.

As of February 15, 2023, this project is being rebid due to an insufficient number of qualified bids received at the Thursday, February 2, 2023, formal bid opening. Work shall consist of furnishing all labor, taxes, materials, equipment, services, permits, incidental and implied, to install a complete working system as designed per the attached drawings and specifications. SECTION 329200 The Track & Field Synthetic Surfacing Contractor shall verify the entire track & field subbase and all events to determine that: The synthetic surface for the 400 meter track oval will accurately fit onto the Asphalt Paving base. That slopes and elevations meet required tolerances. No bird baths exceed the allowable limits as specified. The track & field areas will meet or exceed the rules ofthe sport. The Track & Field Synthetic Surfacing Contractor shall provide all labor, materials and equipment to perform the following work: The Track & Field Synthetic Surfacing Contractor is responsible for installing all track & field synthetic surfacing materials and line markings as designated in these specifications. Review Bidding documents and specifications, provide technical assistance, and approve Asphalt Paving base work as required in the specifications. Review and approve installation of all field event in-ground equipment before any track & field synthetic surfacing is installed as specified and shown on the Drawings. Brush and wash down all areas to be surfaced, as often as necessary during the installation of the track and field synthetic surface. Repair all birdbaths as required in these specifications. Install removable track & field synthetic surfacing (full pour polyurethane) plugs in all pole vault boxes and long/triple jump take-off boards (1-inch by 1-inch corner notches in one short side). Install special material (i.e., foam, board, etc.) in slot drain opening to prevent polyurethane from entering the opening. The drainage slot opening shall be neatly trimmed out (vertical cuts), after polyurethane installation, to allow proper drainage to occur. No polyurethane is allowed on the inside ofthe drainage slot opening. This shall apply only ifthe precast slot drain is installed. Repair all damaged areas, clean-up all glue, and remove excess polyurethane, primers and similar products. All trim cuts shall be neat and clean; on all curves the trim-out shall follow a radius line for accuracy and neatness. All questions are due by 10 AM on Wednesday, January 25th

Final Planning

Educational

$881,000.00

Public - County

Renovation

15

12

21

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
44
Bidding Soon
655
All Active Projects
308
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

August 25, 2023

img_map_placeholder

1 Rocket Dr, Asheville, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.