Site work and outdoor lighting for a playground / park / athletic field in Binghamton, New York. Working plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

For 2021 Capital Improvements Project - Contract No. 6 Athletic Field Lights Construction The Chenango Valley Central School District invites sealed bids to be received for the 2021 Capital Improvements Project. Prospective bidders are invited to submit their stipulated sum bids, including applicable Alternates and unit prices, for work described in general as follows: F. CONTRACT NO. 6 ATHLETIC FIELD LIGHTS CONSTRUCTION NOT BEING BID The project shall be substantially complete in accordance with Document 00 21 13 and Section 01 10 00 for all work as indicated on the Contract Documents. Documents are available to view for free. Documents may be downloaded for a non-refundable fee. Printed portions of the documents may be purchased for a non-refundable fee. Viewing online or the payment of a non-refundable fee to obtain the plans and specifications through downloading or printing is optional. The fee is NOT a deposit and will not be refunded. All prospective bidders using the deposit method, upon returning the first complete set of plans and specifications in good condition within thirty (30) calendar days after the date of award of contracts or rejection of bids, will be refunded the full amount of their deposit for the first set of plans and specifications. For printed portions of the documents or download, the fee is dependent on the size of the documents. Copies of the Contract Documents may be examined at the following offices: a. IBI Group Architects, Engineers, and Landscape Architects 59-61 Court Street, Suite 300 Binghamton, New York 13901 Each bidder must deposit a bid security in the form of a Bid Bond, Certified Check, or Cashier's Check payable to the Owner in the amount of not less than five percent (5%) of the Base Bid amount. The Owner reserves the right to award the contract within forty-five (45) calendar days after the actual date of the receipt of the bids. No bidder may modify or withdraw their bid within forty-five (45) calendar days after the time and date specified for the receipt of bids. The Owner reserves the right to waive any irregularities or informalities in the bid forms or during bidding procedures, and the right to reject any or all bids.

Final Planning

Playgrounds / Parks / Athletic Fields

$700,000.00

Public - City

Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Vehicular Access and Parking, Temporary Controls, Temporary Erosion and Sediment Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors, Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Watering, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
83
Bidding Soon
978
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

September 1, 2023

img_map_placeholder

Multiple Locations, Binghamton, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Capital Improvements Project - Contract No. 6 Athletic Field Lights Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.