BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Everett, Washington. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Mariner High School Renovation and Addition - Multiple Bid Packages BP-02.1 STRUCTURAL AND SELECT DEMOLITION $686,429. BP-06.1 CASEWORK AND FINISH CARPENTRY $594,312 BP-09.2 PAINTING AND COATINGS $152,629 BP-09.3 CARPETING $81,771. BP-09.4 RESILIENT FLOORING AND ACCESSORIES $67,116 BP-11.1 FOOD SERVICE EQUIPMENT $72,473 BP-21.1 FIRE SPRINKLERS $222,207 BP-31.1** EARTHWORK AND UTILITIES $1,974,734 BP-32.1 LANDSCAPING AND IRRIGATION BP-32.2 ARTIFICIAL FIELD TURF BONDS: For all bids equal to or exceeding $300,000 a Performance and Payment Bond will be required. Bidders are to ensure that the cost of this bond is included in their base bid amount. A bid bond in the amount of 5% of the total bid amount is required for all bids that equal or exceed $300,000. TRADE UNIONS: Spee West Construction Co. has an agreement with the Pacific Northwest Regional Council of Carpenters. Trade Contractors shall be bound and obligated to such agreements for work claimed by the Carpenters Union per RCW 39.10.380 Subcontract Bidding Procedure. If Trade Contractor and lower tier subcontractors will be performing work claimed by the Carpenters Union, and are not signatory with the Union, they (Trade Contractor and lower tier subcontractors) will enter into an agreement with the Carpenters Union for performance of the claimed work on this project. BIDDING NOTE: Spee West Construction Co. is acting as GC/CM for the Mukilteo School District for this project. Spee West is not the general contractor for this project. For this reason, all rules for public bidding must be followed by all Trade Contractors bidding on these bid packages. Bids for bid packages must be submitted in accordance with the Instructions to Bidders. All bids shall remain valid for a period of 90 calendar days. Bid Results GWB and Acoustical Assemblies G K Knutson Inc - $1172000 Landscaping and Irrigation Total Ground - $424030

Bid Results

Educational

$1,596,030.00

Public - County

Addition, Demolition, Renovation, Site Work

262

32

27

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
33
Bidding Soon
898
All Active Projects
372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

July 5, 2023

img_map_placeholder

200 120th St SW, Everett, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.