BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2023 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Liberty Hill, Texas. Contact the soliciting agency for additional information.

The City of Liberty Hill, herein after "City", seeks an agreement with a qualified Individual, Firm, or Corporation, herein "Respondent", to provide services to develop a Wastewater Treatment Plant and Systems Master Plan, Impact Fee, and Rate Study (hereinafter referred to as the "Project"). The Proposed Plan shall: 1.1. Identify solutions to current and future wastewater system deficiencies and constraints and guide the implementation of wastewater system improvements over a 20-year planning period. 1.2. Include an analysis of the current availability within City limits and the Extraterritorial Jurisdiction ("ETJ") where the City has a Certification of Convenience and Necessity ("CCN"). 1.3. Provide updated projections on future demands within the current Urban Growth Boundary (UGB), additional land needs for the Project, and identify all system improvements needed to meet future demands. 1.4. Include an analysis of current Impact Fees, and Rates and make recommendations on adjustments. 1.5. Include recommendations to address the findings of the Proposed Plan. Beyond the content of the Proposed Plan, the Consultant shall provide administrative support in the preparation of the Plan, including drafting proposed language for any ordinance revisions required to support the Plan, providing materials and presentations for public outreach, including Planning Commission and City Council meetings. If the recommendation in the Plan is to adjust any rates, the rate structure and system development fees will be reviewed under a separate process, document and contract but will be based on the recommendation of the Proposed Plan. The objective of this project is to complete the Project on, or before eight (8) months from the date of execution, but the City is receptive to alternative proposed timelines of completion. The Method of Contractor Selection has not been determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
113
Bidding Soon
2,093
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

Project location map

Multiple Locations, Liberty Hill, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.