BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Aurora, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Proposed Improvement: Several small areas of pavement patching, sidewalk replacement, curb and gutter replacement, driveway replacement, structure adjustments and other miscellaneous appurtenances all in accordance with the plans and specifications.The City of Aurora has a local preference ordinance that would apply to this contract.All questions should be received by the Purchasing Division by 4 pm Friday January 27th, 2023 so that an addendum can be issued Monday January 30th, 2023 if required. All questions received after Friday will not be addressed. Several small areas of pavement patching, sidewalk replacement, curb and gutter replacement, driveway replacement, structure adjustments and other miscellaneous appurtenances all in accordance with the plans and specifications. The patching and restoration locations are tracked and will be viewable in the ESRI web application. Although the contractor will be given a list every two weeks to establish completion deadlines, the patching locations will be entered as they arise and will be accessible by the contractor in real time. The contractor will be responsible for having the ability to access the ESRI viewer web application as well as the mobile app through a contractor provided phone/tablet to enter in all restoration measurements and site photos to ensure completion of the work prior to an on-site review by the Engineer (Reference Exhibit A). The City will assist with training and initial setup of the App. The locations will be provided in lists for the contractor and any subcontractor to enter in completed quantities, date completed, as well as listing locations as ready for engineering site review. The contractor is expected to enter in all completed fields on a weekly basis, at a minimum, for ease of review and payment. The City of Aurora's inspection and acceptance of each and all locations on a list will be required prior to the payment for that completed list with no lists being skipped. All lists must be completed in the order they are received. See special provision SP A.5 for project timeline. COMPLETION DATE List 1: Provided at the middle of March - Covers Nov 2022- first half of March 2023. List 2: Provided May 1st - Covering second half of March - April 30th. List 3: Provided June 1st - Covering May 1st - May 31st List 4 and On: Provided every 15 days starting on June 15th.

Bid Results

Roads / Highways

$738,400.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
185
Bidding Soon
3,228
All Active Projects
1,405
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 1, 2023

March 3, 2023

img_map_placeholder

Multiple Locations, Aurora, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.