BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Berkeley, California. Completed plans call for site work for a water / sewer project.

The work to be performed under these specifications consists of, but is not limited to Installation of connector pipe screens, inlet filter devices, retractable inlet screens, construction area signs, vehicular and pedestrian traffic control, drainage structure modifications, and other related work. California Contractor License Classification required: A General Engineering The Contractor and any subcontractor working under him must comply with and be governed by the laws of the State of California having to do with the prevailing wage to be paid as is set forth in Division 2, Part 7, Chapter 1, Article 2 of the Labor Code of the State of California as amended The Contractor shall forfeit, as penalty to the City, twenty-five dollars ($25.00) for each laborer, workman, or mechanic employed, for each calendar day or portion thereof, such laborer, workman, or mechanic is paid less than the general prevailing wages hereinafter stipulated for any work done under the attached contract, by him or by any subcontractor under him, in violation of the provisions of said Labor Code. In addition, the Contractor shall pay to the workmen the wages resulting from the difference between the stipulated wage rate and the wages actually paid. When the final contract price for which the Contractor has bonded for a project increases by over twenty-five percent (25%) of the original base bid price due to change orders and/or increases in the quantities of items incorporated into the project, the Contractor shall be entitled to payment for additional bonding costs that have been paid to the surety company due to this increase. Payment for this cost shall be made via change order and included on the final project billing statement with supporting documentation from the Contractor When the final contract price decreases by over twenty-five percent (25%) of the original base bid price due to change orders and/or a decrease in the quantities of items incorporated into the project, the City shall be entitled to a reimbursement of the decrease in bonding costs paid by the Contractor. The refund of these costs shall be made via change order and deducted from the final payment for the release of retention. At the time of execution of the contract by the City Manager, the Contractor will be required to furnish a Surety Company contract bond for faithful performance in the sum of not less than one hundred percent (100%) of the amount of his contract, in addition to which he will be required to furnish a Surety Company labor and material bond in the sum of not less than one hundred percent (100%) of the amount of the contract in accordance with the provisions of state laws. Questions concerning the anticipated work or scope of the project should be directed to Ricardo Salcedo, Associate Civil Engineer, via email at RSalcedo@BerkeleyCA.gov, no later than 12:00 P.M., Thursday, March 14,2024. One (1) fullset of originals and two (2) additional originalsignature pages(Page 9) of the bid must be submitted, on forms which were prepared for this purpose and furnished by the Cit

Bid Results

Water / Sewer

$418,500.00

Public - City

Site Work

19

6

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
176
Bidding Soon
3,399
All Active Projects
1,369
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 21, 2024

July 5, 2024

September 13, 2024

img_map_placeholder

Multiple Locations, Berkeley, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.