EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Slatington, Pennsylvania. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of March 13, 2023, project was awarded to Bruce George Paving and Excavating, Inc., awarded amount is $131,506.84. The Work to be performed for the Slate Heritage Trail Improvements consists of the following: Provide labor and materials to rehabilitate the Slate Heritage Trail, install stormwater improvements, re-deck the Trestle Bridge, and provide new stone for the covered bridge parking lot, Slatington, PA 18080, as more particularly specified in the Contract Documents CLARIFICATION DEADLINE 1/27/2023 10:00 AM Return comments and questions to: Justin Gross Project Manager for Borough of Slatington Lehigh Engineering Associates, Inc. 499 Riverview Drive Walnutport, PA 18088 jgross@lehighengineering.com W: 610-767-8545 F: 610-767-5798 The Bid for the Slate Heritage Trail Improvements (PROJECT) shall be accompanied by a Bid Security in the amount of ten percent (10%) of the total amount of the Bid in the form of a certified check, bank money order, or bid bond. All Bids shall be effective for sixty (60) calendar days from the date of the Bid opening, unless an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, in which case all bids shall remain effective for one hundred twenty (120) calendar days from the date of the Bid opening. On or before the last day during which bids shall be effective, if a contract will be awarded it shall be awarded to the lowest responsible bidder. After issuance of the Notice of Award, such contract must be completed within 90 calendar days from the date of the Notice to Proceed. The successful bidder will be required to provide Construction Performance and Payment Bonds equal to 100% of the contract amount as specified in the contract documents, which bonds shall also cover a 1-year correction period which will commence upon completion of the Work. This project is subject to certain special requirements. For example, as more specifically detailed in the Contract Documents, the successful bidder shall be required to (a) assure protection against discrimination for employees, applicants for employment, and subcontractors on the grounds of actual or perceived race, color, sex, religion, ancestry, genetic information, national origin, sexual orientation, gender identity or expression, familial status, marital status, age, mental or physical disability, use of guide or support animals and/or mechanical aids; (b) pay certain minimum salaries and wages; and ( c) reserved. OWNER reserves the right to accept or reject any or all Bids or portions thereof. This Project Manual is comprised of all forms and documentation needed for the project described herein. Each of the forms listed below is considered a separate chapter of this Project Manual. As a general rule, the chapters are arranged in the chronological order in which they are to be needed. For example, Chapter A- Invitation to Bidders is necessarily first since a potential contractor will need to read the Invitation prior to considering whether he/she/it wishes to acquire Chapter B - Instructions to Bidders for purposes of completing Chapters C through G. Likewise, only after receipt of items C through G, can the Borough of Slatington determine the party, scope of work, and amounts to be set forth in Chapter H - Notice of Award and subsequent forms. The forms/chapters listed below are set forth in the following pages in the order listed. For the sake of clarity, each chapter is identified in the footer of every page and every page is numbered sequentially within each chapter. There is no page numbering system for Project Manual as a whole, but only for each chapter.

Award

Roads / Highways

$131,507.00

Public - City

Paving, Site Work

5

14

2

5

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
178
Bidding Soon
2,691
All Active Projects
1,117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

March 6, 2023

img_map_placeholder

Slate Heritage Trail, Slatington, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Slate Heritage Trail Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.