BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Cottleville, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct the O'Fallon Water Treatment Plant Filters 2 & 5 Rehabilitation Project in O'Fallon, Missouri, with Bid Number:23-003. Work includes the construction of: Installation of new stainless steel underdrains with integral air scour, air scour piping connections, and filter media (coarse sand, filter sand, and anthracite) in Filters 2 and 5. Work also includes removal of existing steel tank floor, placement of new concrete floor, installation of new filter end flume distribution plate, and re-coating of the tank interior and exterior walls. Installation of turbidity curtains within the filter effluent wetwell will also be included as a Bid Alternate. All requests for clarifications on these bidding documents must be received no later than Friday, January 27, 2023, by 2:00 PM. The enclosed Request for Information (RFI) form shall be used for all submittals. Questions may be directed to the Project Manager as follows: Jason Dennis; via phone at 636-379-7503; via email at JDennis@ofallon.mo.us. There is a mandatory bidder's questionnaire (enclosed with the spec book) that is due with the bid. If the questionnaire is not received by this date and time, the general contractor will not be able to submit a bid on this project. The schedule for this contract shall be as follows: 1. Notice to Proceed: February 10, 2023. 2. Delivery of Owner-Supplied Equipment (Underdrains, Air Scour Piping, Flume Distribution Plate, and Sealing Plates) to WTP Site: no later than April 14, 2023. a. Contractor shall provide timely unloading in coordination with the delivery date. 3. Substantial Completion: June 1, 2023 4. Final Completion: June 16, 2023

Bid Results

Water / Sewer

$375,000.00

Public - City

Renovation, Site Work

12

13

7

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
43
Bidding Soon
828
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

February 10, 2023

img_map_placeholder

321 Firma Rd, Cottleville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.