BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Edmonton, Alberta. Completed plans call for the renovation of a detention facility.

Graham Design Builders LP (Graham), as Construction Manager for Alberta Infrastructure requests submissions from Bidders for above named project (the Project) as outlined in the Project Overview and Construction Documents. The intent of this Tender is to solicit and receive formal bid offers to perform the following Work: Work Package 1 Hazardous Materials Abatement Selective demolition required to complete the hazardous materials abatement PROJECT DESCIPRTION The Former Edmonton Remand Centre (FERC), located along 97 Street and 103A Avenue, is just outside if the Downtown Special Area. It is in the Boyle Street Community and currently zoned Alternative Jurisdiction (AJ). Below the FERCs south facing paved entry way is an underground light rail transit (LRT) tunnel and station box bisection the provincially owned parcel of land. The FERC is a 7-story plus basement structure with an area of approximately 18,495 m2, built in 1980. The principle structural component is cast in place concrete and the wall cladding is precast concrete. The building has a mezzanine level on the 2nd, 3rd, and 4th floors. The six floor includes a two-story mechanical room and the seventh floor, or penthouse, has additional mechanical equipment and the elevator machine room. There are recreational courtyards with security mesh roofs on the ground and 6th floors. The main floor includes administrative functions, and a gymnasium. Basement areas are primary for shipping and receiving of goods and prisoners, and kitchen functions. The building is currently unoccupied with limited power and utility services. The building is linked to the adjacent Brownlee Building, Provincial Law Courts, and the City of Edmonton Police Headquarters by an underground tunnel system which parallels the Citys Pedway system and is linked to the LRT system. The intent of this project is to fully abate and demolish the FERC and cap-off existing utility lines and underground infrastructure with no future purposes, with and end state of the current site being constructed for use a parking area. The project value listed reflects the total project estimate.

Post-Bid

Jails / Prisons

$2,514,000.00

Public - State/Provincial

Renovation

34

21

86

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
245
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

July 24, 2023

img_map_placeholder

9660 104 Ave NW, Edmonton, AB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.