BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Raymore, Missouri. Completed plans call for site work for a water / sewer project.

No contract as of yet. The Creekmoor Odor and Corrosion project primarily consists of installation of an activated carbon filtration system to eliminate the Hydrogen Sulfide content in the manhole. The specific locations of the work to be done shall be contained in the special provisions section of the bid document. The contractor shall bid on all work. All equipment, material and workmanship must be in accordance with the Specifications and other Contract Documents. Project manual, plans and specifications, and proposal forms may be viewed at the office of the City Engineer, 100 Municipal Circle, Raymore, Missouri 64083 A bid bond or certified check from a surety or bank, approved by the Purchasing Specialist, in an amount equal to, or greater than, 5% of the maximum total bid price must accompany each proposal. Contractor shall provide a ten (10) hour Occupational Safety and Health Administration (OSHA) construction safety program for all employees who will be on-site at the Project. All wages paid for work under this contract shall comply with the requirements of the prevailing wage law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through 290.340, R.S. MO. 1969, as amended. Pursuant to 610.021 RSMo, Item 12, all documents within a request for proposal (RFP) will become an open record to the public upon a negotiated contract being executed. All documents within a request for bid (RFB) become open record as soon as the bid is opened. Bidders and proposers should be aware that all documents within a submittal will become open records. The Owner reserves the right to reject any or all proposals and to waive informalities or deficiencies therein. To negotiate with any or all bidders or others for more favorable terms or prices, and to award a contract to other than the bidder submitting the lowest cost bid proposal, with or without negotiation and to determine which is the lowest best and most responsive, to accept, at its option, any alternates and to approve the bond. Liquidated Wages:- SCHEDULE OF LIQUIDATED DAMAGES Original Contract Amount Charge Per Calendar Day($) From More Than($) To and Including($) 0 50,000 150 50,001 100,000 250 100,001 500,000 500 500,001 1,000,000 1,000 1,000,001 2,000,000 1,500 2,000,001 5,000,000 2,000 5,000,001 10,000,000 2,500 10,000,001 And above 3,000

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
29
Bidding Soon
728
All Active Projects
290
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 21, 2023

img_map_placeholder

Multiple Locations, Raymore, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.