Site work for a playground / park / athletic field in Lakeside Marblehead, Ohio. Design plans call for site work for a playground / park / athletic field.

As of May 31, 2023, an engineer firm has been selected. Further details regarding design and construction have not been identified. A firm timeline for construction has not been established. The closed solicitation has been included below for reference. A detailed scope has not been released. ODNR maintains campgrounds at 54 State Parks with a total of 8,970 campsites. This project will continue improvements to the electrical utility infrastructure of Parks and Watercraft facilities, primarily at campgrounds. Locations may include but are not limited to East Harbor State Park, Geneva State Park, and Hocking Hills State Park. ODNR continues its ongoing facility assessment and master planning efforts, working with Parks and Watercraft, to identify division and facility needs such as changes in use requirements, operating efficiencies, long-term maintenance/durability issues, and will utilize, adjust, and manage funding to address these needs across ODNR's facility portfolio. The intent of this project is to procure design and construction administration services for electrical improvements at the aforementioned parks. Many of the parks have existing electrical connections that do not provide the appropriate level of electrical service required. ODNR anticipates performing electrical improvements to campground campsites to include 50/30/20A electrical service. The expected lifespan of the improvements will be a 30-year design. The design for improvements should consider current and future trends and usage analysis. The electrical upgrade will include Utility owned - new primary cable, utilityowned new transformers, new standalone stainless-steel distribution panels, new branch circuiting to new camp site pedestals (50/30/20A). Electrical system design must follow the latest NEC guidelines as the NEC code has changed from previous editions. The selected A/E firm will be required to coordinate new equipment installation, new primary cable installation, all scheduled outages, and utility agreements that include ODNR. Submit the requested number of Statements of Qualifications (Form F110-330) directly to Julie Endicott at engineering@dnr.ohio.gov . See Section J of this RFQ for additional submittal instructions. Construction Notice to Proceed: 07 / 24.Substantial Completion of all Work: 06 / 26. The method of Contractor Selection has not been Determined at this time.

Design

Playgrounds / Parks / Athletic Fields

$6,180,200.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
84
Bidding Soon
1,505
All Active Projects
645
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2023

img_map_placeholder

Multiple Locations, Lakeside Marblehead, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.