Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a civil project in Pleasantville, Iowa. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.
As of May 1,2023, project was awarded to Vanderpool Construction but awarded amount not available. U-STEP: UST-005-3(072)--4A-63 W. Pleasant Street & IA Hwy 5 Improvements Project includes construction of northbound and southbound offset right turn lanes and offset left turn lanes at the intersection of Highway 5 and W Pleasant Street. It also includes widening the east leg of W Pleasant Street from a 2-lane to urban roadway a 3-lane urban roadway at the approach to Highway 5, paving approximately 600 feet of the west leg of W Pleasant Street with a 3-lane urban roadway, and paving approximately 600 feet of a 2-lane urban roadway of an unnamed street. The project also consists of a pump station located in the northwest quadrant of W Pleasant Street and Highway 5. The construction improvements include approximately 6,500 SY of 8" PCC street pavement, 6,300 SY of 10" PCC street pavement, 5,000 LF of sanitary sewer, 1,200 LF of storm sewer, 2,600 LF of water main, 32,000 CY of class 10 excavation, subgrade preparation, modified subbase, and subdrain. Other associated improvements include traffic control, signing, pavement marking, erosion control, surface restoration, and miscellaneous associated work necessary to complete the project. completion includes having the roadway fully paved and all lanes open to traffic and all utilities installed and operational. Any delays due to weather, overruns of quantities, utility delays, or any other delays will not be considered as justification to modify the calendar date. Should the Contractor fail to substantially complete the work by the completion date of November 17, 2023, liquidated damages of One Thousand Five Hundred Dollars ($1,500) per calendar day shall be applied for each calendar day after November 17, 2023, until Base Bid is substantially completed. The Contractor shall fully complete the Base Bid of the project, and if selected, Bid Alternative A within 15 working days following substantial completion and notice to proceed when weather conditions allow (permanent lawn mix can be applied between March 1 and May 31, 2024). Fully complete shall be defined as surface restoration being completed and all improvements being ready for final acceptance. Should the Contractor fail to fully complete the work within 15 working days following substantial completion, liquidated damages of Five Hundred Dollars ($500) per calendar day shall be applied for each calendar day after the 15 working days is charged until the Base Bid and the selected Bid Alternative A are fully completed. Bid Alternative A: If awarded, the Contractor shall substantially complete Bid Alternative A by November 17, 2023. Substantial completion includes installation of all sanitary sewer and ALL lanes opened to traffic. Should the Contractor fail to substantially complete the work by the completion date of November 17, 2023, liquidated damages of Five Hundred Dollars ($500) per calendar day shall be applied for each calendar day after November 17, 2023, until Bid Alternative A is substantially completed. Bids will be considered by the City of Pleasantville City Council at its special council meeting at 5:30 P.M. on the 21st day of February, 2023, in said City Council Chambers. The City Council may award a Contract at said meeting, or at such other time and place as shall then be announced.
Award
Roads / Highways
$5,403,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2023
April 17, 2023
IA-5 & Pleasant St, Pleasantville, IA
Related To This Project
Pleasantville, IA
Bid Date: Aug 05 2021
Pleasantville, IA
Bid Date: Nov 09 2023
Pleasantville, IA
--
Pleasantville, IA
Bid Date: Apr 12 2021
Pleasantville, IA
Bid Date: Apr 28 2022
Anthon, IA
Bid Date: Mar 07 2023
Sioux City, IA
Bid Date: Feb 01 2023
Bettendorf, IA
Bid Date: Feb 02 2023
Hiawatha, IA
Bid Date: Feb 21 2023
Fort Dodge, IA
Bid Date: Feb 07 2023
Peosta, IA
Bid Date: Feb 21 2023
Ottumwa, IA
Bid Date: Feb 16 2023
Waukee, IA
Bid Date: Feb 08 2023
Urbandale, IA
Bid Date: Feb 01 2023
Ottumwa, IA
Bid Date: Feb 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.