Site work and paving for a road / highway in Kalamazoo, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of March 28, 2023, project was awarded Pavement Maintenance Systems LLC., and the awarded amount is $335,806.95.** It is the intent of these plans and specifications to provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the Michigan Ave. Preventative Maintenance & Layout as described in the specifications and bid document. The scope of work for this project shall consist of the following work along Michigan Ave. from W. Main St to Harrison St: Crack sealing asphalt pavement. The Contractor shall ensure joints of the existing patch areas and around structures in the roadway are properly crack sealed. Remove existing pavement markings per plan and as directed by the Engineer Place temporary lane markings, construction signage and traffic control for the appropriate phase of work Remove/salvage signs according to plans For each phase of construction: prepare pavement for fog seal by cleaning/sweeping to ensure a dry and clean surface for fog seal application Fog seal the roadway for each phase of construction Place raised temporary pavement markings prior to allowing traffic on roadway Place pavement markings in accordance with plans Place permanent signage Place non-motorized delineators and buffers Remove traffic control and open roadway to traffic The above items of work shall proceed in the order listed. However, some of the items of work can be done concurrently with the approval of the Engineer. All work should be done in accordance with the plans, specifications contained in this contract, latest version of the MMUTCD and the 2020 MDOT Standard Specifications for Construction. Traffic control should be phased according to plan and allow for continued traffic flow along Michigan Ave. Work shall be scheduled in such a way as to minimize the time that side street intersections remain closed. Before a section of work is reopened to traffic, the contractor shall ensure that temporary or permanent pavement markings are in place to direct traffic and ensure lane delineation. All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractors unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price. The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder. The bidder shall have all work completed by August 1, 2023. Questions for this IFB should be directed to: Department Contact: George Waring, Public Works Senior Civil Engineer at waringg@kalamazoocity.org or (269) 303-7844
Award
Roads / Highways
$335,807.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2023
March 8, 2023
E Michigan Ave, Kalamazoo, MI
Related To This Project
Kalamazoo, MI
Bid Date: Feb 08 2023
Kalamazoo, MI
Bid Date: Mar 08 2022
Kalamazoo, MI
Bid Date: Feb 02 2023
Kalamazoo, MI
Bid Date: Jan 31 2023
Kalamazoo, MI
--
Kalamazoo, MI
Bid Date: Jan 31 2023
Kalamazoo, MI
Bid Date: Dec 19 2018
Kalamazoo, MI
Bid Date: Feb 02 2023
Kalamazoo, MI
Bid Date: Feb 14 2023
Kalamazoo, MI
Bid Date: Oct 30 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.