BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Salamanca, New York. Completed plans call for site work for a bridge / tunnel.

Question Deadline :- 02-23-2023 3:00 pm Removal and replacement of the existing culvert, substructure, wingwalls, and installation of new structure with H-pile foundation system and stone masonry work as detailed. Restoration work will include roadway and side embankment replacement to match pre-construction conditions. Camp 12 Culverts - install two new box culverts at existing waterways to provide access from ASP Rte. 2 Camp 12. Work incudes trail/road resurfacing, excavation and embankment work, storm drainage improvements, and guiderail installation. Culverts will include form liner on exterior. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Contract term: 240 days The project cost estimate is $1,584,833.00 to $2,144,186.00. Liquidated Damages :- $1,750.00 day Scope of Work English Brook Culvert is located on ASP Route 1 nearly 2 miles north of ASP Rte. 3 in the Quaker area of Allegany State Park. This is a reconstruction project consisting of the removal and replacement of the roadway arch culvert over English Brook. This is considered a historic structure by State Historic Preservation Office (SHPO) and is being replaced in-kind to the greatest extent practicable. The new structure is a similar arch culvert including concrete wingwalls and headwalls to be lined with stone veneer to represent the aesthetics of the existing structure. Roadside kneewalls are to be built from existing stone salvaged from the structure removal. Work includes new guiderail, underdrain, storm drainage improvements, embankment, and full roadway section replacement. The culvert base footers are to be built on steel H-piles. Camp 12 is located approximately 3-4-mile north of the intersection of ASP Route 2 and France Brook Road on the east side of Allegany State Park. This is a new-build of two box culverts to span Red House Brook and a separate swale near the Camp 12 area, which will provide direct access to Camp 12 from ASP Route 2. Both culverts will be four-sided box structures. The floor of each culvert will be buried below existing stream elevations to provide a natural bottom condition to comply with environmental permit guidance. The new structures will include concrete wingwalls and headwalls to be lined with form-liner intended to match aesthetics of the natural stone in the surrounding areas of the Park. Work includes new timber-faced guiderail, embankment, natural roadway resurfacing, and storm drainage improvements.

Bid Results

Bridges / Tunnels

$2,290,950.00

Public - State/Provincial

Site Work

47

13

4

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
38
Bidding Soon
1,043
All Active Projects
498
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

April 28, 2023

img_map_placeholder

2373 Allegany State Park Rte 1, Salamanca, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.