Site work and new construction of a civil project in Fleming Island, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Project Description: The work consists of furnishing all labor, materials and equipment necessary to complete the following: 1. New pre-engineered metal building, complete as shown and described 2. All architectural features 3. All Electrical, mechanical, structural, plumbing components 4. Building and floor plan is designed to accommodate all BCR Equipment including two 160-GPM rotary disk thickeners, two polymer feed systems, two 15,000-gallon process tanks, one Centrisys 2-Phase Centrifuge and five chemical storage tanks. All equipment inside the new pre-engineered building is provided by others and is not included in the scope of work of this project. The contractor shall review and coordinate equipment shop drawings/component information provided by others. Work includes construction of support concrete pads and containment berms, pipe trenches for piping and stub-outs of electrical and plumbing for the equipment. Refer to specification Section 01010 - Summary of Work for more information. 5. Site work including grading, paving and drainage modifications and additions as shown and specified. 6. Onsite work (outside the building) includes interconnection to existing utilities and wastewater pump station and WAS pump station as shown on the drawings. 7. Relocation of pre-purchased equipment currently stored at various off-site locations to the Fleming Island WRF. Intent to Bid Due Date: Mar 24th 2023, 2:30 PM EDT Questions Due Date: Mar 1st 2023, 12:00 PM EST The Selected Contractor shall perform the Work complete, in place and make ready for construction of improvements at Fleming Island Water Reclamation Facility including A.T he work consists of furnishing all labor, materials and equipment necessary to complete the following: 1. New pre-engineered metal building, complete as shown and described 2. All architectural features 3. All Electrical, mechanical, structural, plumbing components 4. Building and floor plan is designed to accommodate all BCR Equipment including two 160-GPM rotary disk thickeners, two polymer feed systems, two 15,000-gallon process tanks, one Centrisys 2-Phase Centrifuge and five chemical storage tanks. All equipment inside the new pre-engineered building is provided by others and is not included in the scope of work of this project. The contractor shall review and coordinate equipment shop drawings/component information provided by others. Work includes construction of support concrete pads and containment berms, pipe trenches for piping and stub-outs of electrical and plumbing for the equipment. Refer to specification Section 01010 - Summary of Work for more information. 5. Site work including grading, paving and drainage modifications and additions as shown and specified. 6. Onsite work (outside the building) includes interconnection to existing utilities and wastewater pump station and WAS pump station as shown on the drawings. 7. Relocation of pre-purchased equipment currently stored at various off-site locations to the Fleming Island WRF. B. The WRF shall always stay in operation during construction. The Selected Bidder shall furnish, unless otherwise noted, all necessary permits, labor, equipment and materials to complete the following: 1. Mobilization/Demobilization, General Requirements, Bonds and Insurance. 2. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. 3. Site Work b. Erosion Control c. Site restoration including seeding, grassing, and other restoration. Contractor agrees to restore as necessary, any systems that might be impacted during construction. d. Restoration of the project site to pre-construction condition. e. Proper removal and disposal of excess and unsuitable materials f. Construction items as detailed above. 4. Electrical, Instrumentation and Control work shall be constructed in accordance with CCUA Standards, drawings, and specifications to provide a functional and integrated new electrical andcontrol system. 5. Conducting all necessary testing and start-up
Post-Bid
Water / Sewer
$13,000,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2023
April 5, 2023
To Be Determined, Fleming Island, FL
Related To This Project
Fleming Island, FL
Bid Date: Feb 13 2023
Fleming Island, FL
Bid Date: Apr 19 2023
Fleming Island, FL
Bid Date: May 03 2023
Fleming Island, FL
Bid Date: Jun 08 2023
Fleming Island, FL
Bid Date: Jun 13 2024
Fleming Island, FL
Bid Date: Dec 12 2019
Fleming Island, FL
Bid Date: Jun 24 2024
Fleming Island, FL
--
Fleming Island, FL
Bid Date: Sep 19 2022
Fleming Island, FL
Bid Date: Sep 02 2022
Fleming Island, FL
Bid Date: Oct 14 2020
Fleming Island, FL
Bid Date: Jun 02 2022
Fleming Island, FL
Bid Date: Jul 14 2022
Fleming Island, FL
--
Fleming Island, FL
Bid Date: Feb 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.