Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

For Emergency Interconnect with Spring West Work under this Contract includes, but is not limited to the following; Locate existing utilities along designated project area; coordinate with District Operator and locate upstream/downstream Gate Valves and perform any necessary valve shut offs and notify affected commercial property owners of any scheduled service interruptions prior or during construction; installation of proposed 8-inch interconnect waterline and associated meter vault, fire hydrants, and valves; testing and disinfection of installed interconnect waterline; site cleanup and restoration. Deposit for Plans, Specifications, and Bidding Documents will not be refunded: 1) if no bid was submitted or, 2) if not returned in same condition as when issued or, 3) if not returned within five (5) calendar days after bid opening. Subject to the preceding provisions for a deposit refund, the refundable deposit only applies for one set of Plans, Specifications, and Bidding Documents. Additional sets will be furnished at a cost of One Hundred Dollars ($100.00) per set. Plans, Specifications, and Bidding Documents may be examined at the following locations: Langford Engineering, Inc., 1080 West Sam Houston Parkway North, Suite 200 Houston, Texas 77043-5014 In conformance with applicable statutes, the general prevailing wage rates in the locality in which the work is to be performed have been ascertained, and such rates shall be the minimum paid for labor employed upon this project. In addition, the successful Bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, age, or national origin. Effective January 1, 2016, pursuant to Texas Government Code 2252.908 (the "Interested Party Disclosure Act" or the "Act"), the OWNER may not award the contract to a bidder unless the bidder has provided to the OWNER a completed and signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the "TEC"). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC's website, assigned a certificate number, printed, signed and provided to the OWNER. The TEC Form 1295 may accompany the bid or may be submitted separately but must be provided to the OWNER prior to the award of the contract. The OWNER reserves the right to reject any or all bids and to waive informalities in bidding. In case of ambiguity or lack of clearness in stating the prices in any bid, the OWNER reserves the right to consider the most advantageous construction thereof, or to reject the bid. The award will be made to the responsible bidder submitting the lowest acceptable bid. The OWNER shall evaluate bids based on total cost, CONTRACTOR experience with OWNER, CONTRACTOR experience with other entities, equipment, and deliverability within the project time, AND deliverability of the completed work. The CONTRACT will be awarded to any responsible person or persons that, in the Board's judgement, will be most advantageous to the District and result in the best and most economical completion of the District's proposed plants, improvements, facilities, works, equipment, and appliances.

Bid Results

Water / Sewer

$101,547.00

Public - County

Site Work

7

10

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Wood Paneling
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
57
Bidding Soon
2,765
All Active Projects
1,123
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

March 6, 2023

img_map_placeholder

Multiple Locations, Houston, TX

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Emergency Interconnect with Spring West

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.