EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 9, 2023 at 7:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Wayne, Pennsylvania. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Tredyffrin/Easttown School District requests sealed bids for Bid Package 3, Exterior Renovations and Upgrades at Exterior Renovations & Upgrades at Beaumont Elementary School (BES), Devon Elementary School (DES), New Eagle Elementary School (NEES), Valley Forge Elementary School (VFES), Tredyffrin Easttown Middle School (TEMS), Valley Forge Middle School (VFMS), and Conestoga High School (CHS). The project consists of general construction renovations and upgrades to exterior of Beaumont Elementary School (BES), Devon Elementary School (DES), New Eagle Elementary School (NEES), Valley Forge Elementary School (VFES), Tredyffrin Easttown Middle School (TEMS), Valley Forge Middle School (VFMS), and Conestoga High School (CHS). Including, but not limited to, metal coping repairs on BES; stucco repair at BES and DES; sealant replacement and repairs at DES, NEES, TEMS and CHS; concrete footer repair at NEES; Paving and curb repairs and sidewalk ADA improvements at VFES and VFMS; bollard installation at CHS; and flagpole installation at VFES. The Board of School Directors reserves the right to reject any or all bids and to waive errors or technical defects in the bid or bid forms. Questions regarding this project shall be submitted via portal

Bid Results

Educational

$1,249,783.00

Public - County

Paving, Renovation, Site Work

33

14

41

6

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Rehabilitation of Cast-in-Place Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Flashing and Sheet Metal, Sheet Metal Flashing and Trim
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Other Specialties, Pest Control Devices
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
439
Active Projects
243
Bidding Soon
3,978
All Active Projects
1,933
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

April 7, 2023

img_map_placeholder

Multiple Locations, Wayne, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bid Package 3, Exterior Renovations and Upgrades at Exterior Renovations and Upgrades at BES ,DES,NEES ,VFES ,TEMS ,VFMS ,CHS

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.