BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Monroe, North Carolina. Completed plans call for the renovation of a educational facility.

It is the sole responsibility of the contractor to become familiar with all aspects of this project prior to bid submittal. Failure to meet this requirement will not be grounds for a change order. During the bid process, all communication relating to this bid shall be directed to the Procurement Lead identified above. Failure to meet the requirement may consider your bid non-responsible. All questions and product substitution requests relating to this project shall be directed to the Procurement Lead identified above in the form of an email no later than 3:00 p.m, January 31, 2023. Answers will be provided to all bidders. Project consists of installing wall dividers at Indian Trail Elementary School, Marvin Elementary School, Wesley Chapel Elementary School per the specifications listed in the bid documents and drawings provided by DH&A Architecture. Contract documents are intended to specify basic description of the Work to be provided in the contract. The Contractor is responsible for field verifying all aspects of this project and to comply with all current local, state, and national codes and regulations. This includes, but not limited to, complying with all ADA requirements. In the event of a conflict between the Scope of Work and code regulations, the Contractor shall notify the assigned UCPS Project Coordinator for direction. Project is to be considered Turn-key. Contractor shall provide all equipment, materials, labors, permits, inspections, supervision, travel, etc. as needed for intended purpose of project. February 14, 2023 - Notice to Proceed anticipated for release (Contact Procurement Lead if not received). April 7, 2023 - Commence work onsite (Teacher Workday) April 14, 2023 - Substantial Completion (Teacher Workday) April 21, 2023 - Final Completion All Work must be coordinated with assigned UCPS Project Coordinator to ensure no disruptions to school activities. UCPS reserves the right to modify the above schedule as needed. Spring Break is from April 7, 2023 through April 14, 2023. Work taking place outside of the days specified above may take place on business days after 2:30 p.m. provided that the classrooms are prepared for class the next morning.

Post-Bid

Educational

$125,000.00

Public - County

Renovation

12

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
140
Bidding Soon
1,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

April 7, 2023

Project location map

Multiple Locations, Monroe, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.