BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2023 at 8:00 PM

Updated June 13, 2025

Demolition, site work and addition to a mixed-use development in West, Texas. Completed plans call for the addition of a office development; for the demolition of a office development; for site work for a office development; water / sewer project; water / sewer project; and water / sewer project.

City of West WWTP Expansion generally consists of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place a new 0.9 MGD Wastewater Treatment Plant including lift station, drum screens, aeromod system, chlorine contact basin, filters, admin building, chlorine building, NPW building, belt press building, switch gear and enclosure, generator, effluent flow meter, electrical, instrumentation, controls, SCADA and all necessary components as shown on the drawings and required by the specifications. Project will be awarded to proposal providing best value to Owner based on a number of factors including cost, experience of contractor, and prior work performance. The deadline to ask questions is 3/15/2023 5:00 PM CST.All questions about Competitive Sealed Proposal Process or meaning or intent of Contract Documents are to be directed to Engineer. Contact: Kyle Schulze Walker Partners 823 Washington Avenue, Suite 100 Waco, TX 76701 (254) 714-1402. Proposals must be submitted on forms provided in Proposal Documents and accompanied by a Proposal Security in the penal sum of not less than five percent (5%) of base proposal amount, payable without recourse to Owner. Proposal Security may be in either form of a cashier's check or Offerer's Bond from a security company approved to conduct business in State of Texas as a guarantee that offerer will enter into a contract and execute a 100% payment bond within fifteen (15) days after issuance of a notice of award to that Offerer. Proposals not accompanied by such Security or received after designated proposal time will not be considered. Owner reserves the right to reject any or all Proposals and to waive informalities and irregularities. For more information, contact Amy Jo Moreno at (254) 714-1402 or amoreno@walkerpartners.com. Engineer's Opinion of Probable Construction Cost for this project is $21,000,000.00

Bid Results

Water / Sewer

$19,057,775.00

Public - City

Addition, Demolition, Site Work

312

40

97

9

Subscribe For Documents

242 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
8
Bidding Soon
1,545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

May 1, 2023

Project location map

To Be Determined, West, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.