Published March 9, 2023 at 7:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Burlington, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of March 9th, 2023 this project is pending an award decision until April 5th, 2023 city council meeting. Paving (Parking Lot Paving), Pavement - Marking, Sidewalks/Curbs/Gutters, ADA Curb Ramps, Sewer Re-Lining, Landscaping, Stormwater Improvements, Erosion Control - Temporary, Paving (Asphalt or Concrete) The work includes furnishing of all materials and equipment and performance of the following work, per the Plans, Specifications and Contract Documents (PS & CD). The Base Bid work for the above contract includes the mill and overlay of Beth and Austin Court. The major work items and approximate quantities for which bids are requested include: 4,000 SY of asphalt milling, 1,000 Tons of HMA Pavement, 635 SF of Concrete Sidewalk (including four sidewalk accessible ramps), 900 LF of Sanitary Sewer Re-Lining, Manhole Re-Lining, spot curb replacement, driveway replacement, traffic control, and restoration. Along with the Base Bid is 12 additional bids. The additional bids are for ten (10) alleys and two (2) parking lots, with 3 full reconstructs (Robert/Highland, Chandler/Pine, Highland/Chandler - West), and the rest mill and overlays. The alleys and parking lots included are as follows: o Off N Oakland Avenue (between Park Ave and Westridge Ave), o Off N Oakland Avenue (between Walnut St and Summit Ave), o Off N Kendrick Avenue (just north of W State Street on the west side), o From S Kendrick Avenue to S Oakland Avenue (between W State St and Orchard St), o From E Highland Avenue to E Chandler Blvd (between Edward St and S Perkins Blvd), o From E Chandler Blvd to N Pine Street, o From E Highland Avenue to E Chandler Blvd (between S Perkins Blvd and Henry St), o From Robert Street to E Highland Avenue (between S Perkins Blvd and Henry St), o From Robert Street to Alice Street, o E Washington Street Alley (between N Pine St and N Perkins Blvd; next to Wisconsin Power Yoga), o W Chestnut Street Parking Lot (across from Mill St/W Chestnut St intersection) o E Washington Street Parking Lot (across from N Perkins Blvd/E Washington St intersection), Major work items and approximate quantities for all mandatory additional bids which are requested include: 2,900 tons HMA Pavement, 2,200 CY of excavation common, 3,600 TON of Base Aggregate Dense 1-1/4", and 2,000 SY of landscape restoration. These improvements include storm sewer work, clearing, replacement of concrete curb and gutter, concrete driveway replacement, sawing asphalt and concrete, concrete sidewalk replacement, traffic control, parking lot pavement marking, new signage, and erosion control. The Owner reserves the right to reject any or all bids, waive or not waive any informality in the bids received and to accept any proposal, which they deem most favorable to the interests of the Owner, the City of Burlington. The Owner will only consider Bids from Bidders who accompany them with bank money order, a Bid Bond, or a qualified certified check, payable to the City of Burlington, in the amount equal to 5 percent of the Bid. This requirement serves to guarantee that, if the Owner accepts the Bid, the selected Contractor will execute and deliver the proper Contract Agreement and Bonds within 15 calendar days after the Notice of Award by the Owner. Failure to return these documents within this prescribed time will result in forfeiture, to the Owner, of the selected Contractor's cash, Bid Bond, or cashier's check, as liquidated damages. BIDDER'S PREQUALIFICATION: A Bidders qualification statement form will be issued with the Bid Documents. The Bidders Qualification Statement form must be completed and submitted in a sealed envelope at the time of Bid submittal. No bids will be accepted from any Bidder who has not submitted a Bidders Qualification Statement form. Contractors who have submitted prequalification statements to the City of Burlington shall state this on their Bidders Qualification Statement form. These prequalification forms will be reviewed; however, updated proof of qualification may be requested by the Owner prior to acceptance of any bid. The Owner reserves the right to reject the bid of any Bidder who has been determined to be unqualified. As a part of their Bids, Bidders shall submit a full and complete list of: 1) all of their proposed Subcontractors, and 2) the class of work which each will perform. The selected Contractor shall not alter this list without the written consent of the Owner. The PS & CD require that the selected Contractor and Subcontractor(s) furnish a Certificate of Insurance. Bidders shall submit Bids on blanks prepared for that purpose and shall state prices in writing and in figures. Use the form contained in the PS & CD. Bidders should pay attention to the requirements for Bid signatures, as set forth in Bid Security. Bidders may not withdraw their Bids within the 60-day period after the date of the Bid Opening.
Bid Results
Roads / Highways
$1,456,336.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2023
March 9, 2023
Multiple Locations, Burlington, WI
Related To This Project
Burlington, WI
Bid Date: Mar 01 2023
Burlington, WI
Bid Date: Mar 09 2023
Burlington, WI
--
Burlington, WI
--
Burlington, WI
Bid Date: Apr 06 2023
Burlington, WI
Bid Date: May 09 2023
Burlington, WI
Bid Date: Mar 16 2023
Burlington, WI
Bid Date: May 17 2023
Burlington, WI
Bid Date: Feb 09 2023
Burlington, WI
--
Burlington, WI
Bid Date: Jul 13 2021
Burlington, WI
Bid Date: Aug 08 2022
Burlington, WI
Bid Date: Jun 09 2022
Burlington, WI
Bid Date: May 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.