Published February 3, 2023 at 7:00 PM

Updated January 25, 2024

Site work, paving and outdoor lighting for a mixed-use development in Hartland, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project involves the replacement of 4 hydrants and hydrant valves, 3 mainline 8-inch water valves, replacement of catch basin frames and grates, resetting existing catch basin frames, replacement of manhole and catch basin concrete adjustment rings for various structures in the Village, 70-feet of 4-inch sanitary lateral installation, abandonment of 2 existing copper water service connections and new connections to an existing water main, concrete curb and gutter replacements, concrete driveway replacements, asphalt driveway replacements, asphalt roadway patching, landscape restoration, erosion control, and traffic control. Pre-Qualification: Yes Pre-Bid Meeting Info: No Pre-Bid Meeting. All Work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of Village of Hartland and the Consulting Engineer during regular business hours. Construction time is of the essence. Completion delays are subject to liquidated damages. A Bidder's qualification statement must be delivered to Village of Hartland at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Hartland equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Hartland as liquidated damages. The Village of Hartland reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes.

Bid Results

Roads / Highways

$230,902.00

Public - City

Outdoor Lighting, Paving, Site Work

16

17

2

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Wall Finishes, Stone Facing
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Other Specialties, Flags and Banners, Flags
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
106
Bidding Soon
1,626
All Active Projects
603
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

March 6, 2023

img_map_placeholder

Multiple Locations, Hartland, WI

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2023 Utilities Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.