BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a detention facility in Waco, Texas. Completed plans call for the renovation of a detention facility.

SCOPE OF WORK A. McLennan County Maintenance of Building, MOB, for highway six (6) Jail, is seeking the services of a bonded contractor, to provide service to replace multiple sliding door control system mechanisms. This project consist of furnishing all equipment, materials and labor necessary for completion. B. Contractor, shall remove twelve (12) sliding doors currently in place, properly and securely store doors onsite, in a designated area. Once the doors have been removed and properly stored, awarded vendor, shall replace and install each control mechanism. Once the control mechanism has been installed and replaced, stored doors are to be properly reinstalled to a fully functional and operational capacity. C. Hours of delivery/service shall be between 9:00 a.m. and 4:00 p.m., Monday through Friday, unless otherwise stipulated. D. The scope of work will consist of, but not limited to the below: D.1. All power supplies, wiring, and controls will be provided by McLennan County, through a separate vendor. D.2. Replacement of sliding door operators/controls (twelve (12) unit total). a. Remove existing doors and store in secure onsite location. b. Remove and dispose of existing pneumatic sliding devices and housings. c. Remove and dispose of existing airlines from source to devices. d. Prime, paint, and repair existing doors as necessary. (Paint to match/flush with existing color) D.3. Re-install existing doors: a. Doors to be hooked back up, adjusted, lubricated, tested and to be fully operational and functional. b. Install new (Southern Steel 3150LXbHC-1) Electro Mechanical sliding devices with emergency releases per Southern Steel, specifications. c. Caulk, prime, and paint all new housings and necessary components. d. Provide twenty (20) additional emergency release tools. e. The performance period for this project shall not exceed 180 days, day-for-day, from beginning to end. Please direct any questions to Ken Bass, Purchasing Director, (254) 759-5627 or email ken.bass@co.mclennan.tx.us.

Award

Jails / Prisons

$169,868.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
32
Bidding Soon
1,210
All Active Projects
473
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 20, 2023

img_map_placeholder

3201 Marlin Hwy, Waco, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.