BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.

The Work includes interior and exterior millwork and Casework with other work-related assemblies involving lumber, plywood, plastic laminates, molding, paneling, casework, shelving, benches, handrail, paint, stains, cabinet doors and hardware. Projects may be part of facility restoration, remodel, reconfiguration, new work, repairs, and installations. This contract does not include work for asbestos containing materials (ACM). Recycling of waste from the projects and use of recycled products is encouraged. The contract will be awarded for an estimated amount not to exceed $300,000.00, which includes Washington State Sales Tax. The Contractor shall furnish all labor, tools, equipment, materials, and incidentals necessary to perform the work as requested by the Port of Seattle via a Work Authorization. All Contractor labor shall be provided as defined by the labor classifications per the Schedule of Unit Prices listed in Document 00 41 00 - Bid Form. The contract will last one (1) year, 365 calendar days, from the official contract award date, which is the date the Port of Seattle signs the Agreement, or until the contract amount is depleted, whichever comes first. This contract contains an option to extend the contract time up to 12 months beyond the original contract completion date. Performance and Payment bonds will be required with the Contract. Each bond shall be in the full amount of the contract sum. A bid bond is not required. Labor and Industries require a "Statement of Intent to Pay Prevailing Wages" and "Affidavit of Wages Paid". The expense of such is the responsibility of the Contractor. If the Port exercises its option to extend the contract an additional year, then new Intents and Affidavits will be required for the additional contract year at the prevailing wage rates published at that time. The contract rates will be amended to reflect the changes in prevailing wage, if any. A portion of this Contract requires work to be performed within an area of the Airport controlled for security reasons. All Contractor personnel working in restricted areas (including AOA, Secured, SIDA and Sterile areas) on this project shall have Port of Seattle airport-issued identification / access badges in accordance with Title 49, Code of Federal Regulations (CFR), Part 1540/1542 and the Airport Security Plan. Bidders should consider the impact of acquiring badges when preparing their bids. Question Cut-off Date: Feb 1, 2023, 2:00:00 PM

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
30
Bidding Soon
902
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.