BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Babylon, New York. Conceptual plans call for site work for a water / sewer project.

SBA Market Survey: Fire Island Inlet to Montauk Point Suffolk County, NY, Contract 3 January 9, 2023 1 CENAN-EN MEMORANDUM FOR Chief, Contracting Division SUBJECT: SBA- Market Survey Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 3 Project Please advertise the information below in the SAM.gov for a period of fifteen (15) calendar days: THIS IS A SOURCES SOUGHT ANNOUNCEMENT TO BE USED FOR MARKET ANALYSIS ONLY. NO AWARDS WILL BE MADE FROM THE RESPONSES TO THIS SYNOPSIS. NO SOLICITATION WILL BE AVAILABLE AT THIS TIME. HOWEVER, RESPONSES WILL BE USED TO DETERMINE THE APPROPRIATE ACQUISITION STRATEGY FOR A FUTURE ACQUISITION. The purpose of this announcement is to gain knowledge of potential business sources; with specific interest in small business, certified 8(a) serviced by SBA districts, certified HUB Zone, and Service-Disabled Veteran-Owned Small Business (SDVOSB), for work on dredging and beach creation construction contract. The NAICS Code is 237990 (Other Heavy and Civil Engineering Construction) (size standard $33.5 million average annual receipts for preceding three fiscal years). No awards will be made from the responses to this synopsis. No solicitation will be available at this time. Responses will be used to determine appropriate acquisition decisions for a future procurement. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT The New York District, U.S. Army Corps of Engineers (District) is preparing plans and specifications for the Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 3 Project. FIMP Contract 3 is a structural contract that includes offshore dredging and sand placement along the ocean shoreline, berm to elevation +8.5 NAVD88 (+9.5ft NGVD29), and offshore channel at Tiana Beach as part of a proactive breach response with an approximate fill volume of approximately 1,500,000 cubic yards. Placement of fill to form a feeder beach at Downtown Montauk was originally proposed as a portion of Contract 3. However, it will now be included in FIMI PIR 2019-11 as an option. In addition to the proactive breach response, Contract 3 also includes two Coastal Process Features (CPFs #11 & #12) located on the eastern portion of Westhampton Island, west of Shinnecock Inlet and Shinnecock County Park West. CPF #11 is located along the Dune Road bayside shoreline and will consist of fill placement within the offshore channel and along the shoreline as well as groin removal. CPF #12 is located at Tiana Bayside Park and will consist SBA Market Survey: Fire Island Inlet to Montauk Point Suffolk County, NY, Contract 3 January 9, 2023 2 of bayside fill placement along the channel and shoreline and burial of existing gabions. The initial expected volume is approximately 100,000 cubic yards for the two CPFs. The project provides erosion risk reduction via berm fill to the ocean shoreline, augments coastal resiliency with restoration of the barrier island, and enhances the overall barrier island and natural system coastal processes. The feeder beach is to provide adequate sand into the system to maintain the existing, natural beach and to account for sediment loss that is expected over a four-year cycle. Construction cost is in the range of $50,000,000 to $100,000,000. OPERATIONAL CONSTRAINTS The Contractor will conform to all local, state, and federal laws while carrying out the construction process for this project. The Contractor shall prepare and submit a site-specific safety and health plan to the government for approval prior to mobilization. SURVEY OF THE CONSTRUCTION CONTRACTOR INDUSTRY The following is a confidential survey questionnaire designed to apprise the US Army Corps of Engineers, NY District, of any prospective construction contractors' project execution capabilities. Please provide your response to the following questions. At the end of this survey, you will be asked to provide your comments. General The proposed project is for Shore Protection and Beach Renourishment work. 1. Description of project: FIMP Contract 3 is a structural contract that includes offshore dredging and sand placement along the ocean shoreline, berm to elevation +8.5 NAVD88 (+9.5ft NGVD29), and offshore channel at Tiana Beach as part of a proactive breach response with an approximate fill volume of 1,500,000 cubic yards. In addition to the proactive breach response, Contract 3 also includes two Coastal Process Features (CPFs #11 & #12) located on the eastern portion of Westhampton Island, west of Shinnecock Inlet and Shinnecock County Park West. CPF #11 is located along the Dune Road bayside shoreline and will consist of fill placement within the offshore channel and along the shoreline as well as groin removal. CPF #12 is located at Tiana Bayside Park and will consist of bayside fill placement along the channel and SBA Market Survey: Fire Island Inlet to Montauk Point Suffolk County, NY, Contract 3 January 9, 2023 3 shoreline and burial of existing gabions. The initial expected volume is approximately 100,000 cubic yards for the two CPFs. 2. The North American Industry Classification System (NAICS) code is 237990 (Other Heavy and Civil Engineering Construction). The Small Business Size standard is $25,500,000. 3. The following information is required from interested sources. (a) Name of firm with address, phone, and fax number, point of contact and email address. (b) Identification and verification of the company as a Small Business Administration (SBA) certified HUBZone Small business firm, or a Service-Disabled Veteran Owned Small Business firm, or an SBA certified 8(a) firm with an SBA approved office for performing a competitive acquisition in the State of New York, or a Small Business firm under the size standard assigned to the procurement. (c) A CAGE Code and DUNS Number for the firm. (d) Statement of Interest: Please indicate whether your firm intends to submit an offer for this project. (e) Qualification Criteria: Responses to this Source Sought shall provide information that indicates the contractor has the experience to perform the work as specified above. Firms should respond to this notice by providing at least three relevant projects that the firm performed as a Prime Contractor. No more than five relevant projects can be submitted as Past Experience. Firms SHALL provide the dollar value of past relevant projects that the firm performed. (f) Also include: (i) Forecasted use of materials, equipment including land- based equipment and pumps and storage location if applicable; (ii) Capabilities and Capacity for intended operations. SBA Market Survey: Fire Island Inlet to Montauk Point Suffolk County, NY, Contract 3 January 9, 2023 4 (g) Have you worked with environmental window restrictions, e.g., Piper Plover, Sea Turtle (h) Bonding Capacity: per contract and total bonding capacity. (i) The interested contractor should list the percentage and type of work that they will self-perform. Interested responders should refer to the following FAR Clauses to see the Limitations on Subcontracting that pertains to specific Set-asides. FAR 52.219-14 pertains to Small Business and 8(a) Set asides). If the acquisition is set-aside for all Small Businesses or the 8(a) Program, the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. FAR 52.219-3 pertains to HUBZone Set asides. If the acquisition is set- aside for HUBZone Small Businesses, at least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the HUBZone prime contractor's employees; and at least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the HUBZone Prime Contractor's employees or on a combination of the HUBZone Prime Contractor's employees and employees of HUBZone Small Business concern Subcontractors; and no more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone Small business concerns. FAR 52.219-27 pertains to Service-Disabled Veteran Owned Small Business (SDVOSB) set-asides. If the acquisition is set-aside for SDVOSB, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other Service-Disabled Veteran Owned Small Business concerns. A joint venture may be considered a Service-Disabled Veteran Owned Small Business concern if at least one member of the joint venture is a Service-Disabled Veteran-Owned Small Business concern, and makes the following representations: That it is a Service- Disabled Veteran Owned Small Business concern, and that it is a Small SBA Market Survey: Fire Island Inlet to Montauk Point Suffolk County, NY, Contract 3 January 9, 2023 5 Business concern under the North American Industry Classification Systems (NAICS) code assigned to the procurement; and each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement; and the joint venture meets the requirements of paragraph 7 of the explanation of Affiliates in 19.101 of the Federal Acquisition Regulation. The joint venture meets the requirements of 13 CFR 125.15(b). (j) Would you be willing to bid on the project described above Please provide a brief description. If the answer is no, please explain why not. (k) Would you be bidding on this project as a sole contractor, prime contractor with subcntractor(s) or as a joint venture (l) Is there a dollar limit on the size contract that you would bid (m)What are the largest construction contracts (in dollar amounts) on which you were the prime contractor (n) What is your bonding capacity per contract What is your total bonding capacity (o) Is your company a small or large business as defined by the SBA Are you classified as a certified 8(a) serviced by SBA districts, certified HUB Zone, or Service-Disabled Veteran-Owned Small Business (SDVOSB) Equipment What type of standard construction equipment do you own and/or operate for work on soft soils such as hydraulic excavators outfitted with long reach booms, low-pressure off- road hauling equipment, low ground pressure dozers, low ground pressure utility vehicles, use of timber mats to support excavators and to assist in moving across wet areas of the site that is suitable for the work described For each item of equipment that you list, please specify its load capacity, modifications and any other relevant characteristics. Contractor's Comments or Recommendations SBA Market Survey: Fire Island Inlet to Montauk Point Suffolk County, NY, Contract 3 January 9, 2023 6 Please provide, if any. Please note that this notice is not a commitment on the part of the Government to award a contract as a result of this notice or to pay for any information received. This synopsis neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. The Government should not construe this Sources Sought Synopsis as a commitment for any purpose. The Government does not intend to rank submittals or provide any reply to interested firms. Submit three (3) Survey Questionnaires to: Attn: Michael McCue - Michael.l.mccue@usace.army.mil Survey Questionnaires will not be accepted after 4:00 pm on the original response date shown in the advertisement in the Beta.Sam.gov. If the original response date falls on a Saturday, Sunday, or a Federal Holiday, the response date will move to the next business day. Facsimile transmissions of the qualification statements will not be accepted. Due to heightened security around 26 Federal Plaza, be prepared to leave ample time to enter the building. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$100,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
212
Bidding Soon
4,120
All Active Projects
1,895
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2024

img_map_placeholder

Multiple Locations, Babylon, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.