Site work for a water / sewer project in Pico Rivera, California. Conceptual plans call for site work for a water / sewer project.
The City of Pico Rivera is seeking a qualified firm to perform engineering design services associated with the City's Water Main Replacement Projects. The Consultant shall provide all services necessary to assess, evaluate, and provide plans, specifications and estimate package (PS&E) and the preparation of the construction bid package per local, state, and federal requirements for water main replacement projects in a professional and competent manner for the bidding purposes. The water main projects will replace approximately 1,975 linear feet (LF) of 4-inch water main with 8-inch water main, 4,580 linear feet (LF) of 10-inch water main, 3,500 linear feet (LF) of 17-inch water main with 18-inch DIP water main, and associated service lines, valves, fire hydrants and other appurtenances. Other Details Project tasks shall include, but are not necessarily limited to, those items noted below. If the Consultant feels that additional tasks are warranted, they must be clearly identified in the Consultant's proposal. The selected Consultant shall provide all instruments, equipment, tools, personnel, and supervision required to provide the engineering design services for the water main replacement project identified in this scope, including but not limited to the following tasks: 1. Become familiar with the City's potable water distribution systems in the area by reviewing City-provided maps of the pipeline networks and available "as-builts" / record drawings and site-specific data to be used as references. 2. The City will make available the GIS geodatabase as well as the latest aerial for the specific site and subject neighborhood where available. 3. Obtain existing substructure facilities/utilities information from respective utility agencies or company for inclusion to the construction plans. 4. A field visit of the project area/ site shall be warranted. 5. The Consultant or its California Registered Land Surveyor shall conduct the necessary land surveys in order to prepare design and construction plans for the project. Such surveys shall provide sufficient site-specific data for proper and accurate design. 6. Design and prepare construction plans and special provisions for the Project, in accordance with the City Standard, and latest applicable AWWA Standards. 7. The construction plans shall be submitted at the following levels: Preliminary Plans (plan view only) - 35% Design Plans (Phases) - 65%, 90%,100% and Final (Note: Scale shall be 1 inch = 40 feet) Final Plans shall be provided on AutoCAD files with all the external references, survey, topo, etc. E-transmitted) shall also be provided to the City. 8. The construction plans, at a minimum, shall identify and provide details of point of connections to existing water main lines; and identify water main, service lines, valves, and appurtenances to be protected-in-place, abandoned, removed, replaced, or eliminated. 9. Complete Project Specifications and Special Provisions and complete Construction Bid Package including compliance requirements with local, state, and federal regulations and program requirements shall be provided with the 90% Design Plans submittal. Electronic copies of the Project Specifications (PDF and MSWORD file) shall also be provided. (City to provide to the selected Consultant the current Specifications Template for use/ reference.) 10. Complete Engineer's Cost Estimate (including list of quantities and estimated cost per unit) shall be provided with the 65%, 90%, & 100% Design Plans submittal. Quantities shall be shown on each plan sheets. Electronic copies of the Engineer's Cost Estimate (EXCEL file) shall also be provided. 11. The Consultant shall have all calculations, reports, specifications, and plans signed and stamped by a California Registered Civil Engineer. Such registrations shall be current. 12. All work submitted by the Consultant shall be complete and shall be carefully checked prior to submission. If the City discovers any errors or omissions prior to approving the Consultant's work, the work will be returned for correction and the Consultant will not be allowed additional compensation. Should the City or others discover errors or omissions in the work submitted by the Consultant after the City's approval thereof, the City's approval shall not be used as a defense by the Consultant. Online Q&A Yes Q&A Deadline 02/02/2023 3:00 PM (PST) Pre-Bid Meeting No The method of contractor has not been determined at this time.
Conceptual
Water / Sewer
$3,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2023
Multiple Locations, Pico Rivera, CA
Related To This Project
Pico Rivera, CA
Bid Date: May 17 2023
Pico Rivera, CA
--
Pico Rivera, CA
Bid Date: Mar 16 2023
Pico Rivera, CA
Bid Date: Apr 03 2023
Pico Rivera, CA
Bid Date: Apr 27 2023
Pico Rivera, CA
Bid Date: Apr 27 2023
Pico Rivera, CA
Bid Date: May 31 2023
Pico Rivera, CA
--
Pico Rivera, CA
Bid Date: Jan 19 2023
Pico Rivera, CA
--
Pico Rivera, CA
Bid Date: Jan 05 2023
Pico Rivera, CA
Bid Date: Oct 23 2018
Pico Rivera, CA
Bid Date: Dec 15 2020
Pico Rivera, CA
Bid Date: Aug 30 2018
Pico Rivera, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.