BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving, outdoor lighting and renovation of a mixed-use development in Santa Rosa, California. Completed plans call for the renovation of a fire / police facility.

This project is the child project to Fire Station 5. It is seeking an agency construction management and inspection position as stated below. The scope of services should include, at a minimum, Agency Construction Management and Construction Inspection as defined and described in the American Public Works Association (APWA) publication titled, "Management of Public Works Construction Projects". Your management and inspection services shall be in general conformance with the APWA publication, or other infrastructure industry publication with comprehensive guidelines for management and inspection of Public Works projects that is acceptable to the City. Requested deviations are to be presented in proposal and may affect the scoring of the consultant The approximately 2.11-acre project site is in the northwest portion of a larger property located at 1400 Fountaingrove Parkway (APN 173-670-022). The site is currently undeveloped and does not have a separate address listed by the City. The proposed project is called the Fire Station 5 Resiliency and Relocation Project (Project). The Project rebuilds a former fire station that was located on Newgate Court, approximately 4,000 feet northeast of the Project site which burned in 2017 Tubbs Fires. The Project is a replacement of a temporary facility located approximately 4,000 feet southeast from the proposed Project site at 3480 Parker Hill Road. Development would occur in two areas of the parcel. The western portion of the site would be developed with a new approximately 10,763 square-foot, twostory, fire station essential services building. At its tallest point, the fire station would be 29 feet tall. Additional ground disturbance of up to 1.9 acres of previously disturbed and developed public right of way adjacent to the site for utility connections, and intersection and frontage improvements is also proposed. On the east side of the site (in the panhandle), a paved parking lot with approximately 20 spaces would be developed. Trees and landscaping destroyed by the Tubbs Fire would be removed. Other proposed improvements to support the new fire station include road median and striping improvements, light signalization changes, and relocation of an aboveground PG&E transformer. The existing aboveground PG&E transformer is located the west side of the site along Fountaingrove Parkway. This transformer serves the AT&T Switch Gear Building south of the site, along the existing gravel access road. Project construction would necessitate moving the transformer to a location yet to be determined by PG&E. AT&T and PG&E infrastructure is located underground at the proposed new fire station site and will need to be relocated. Work for utility relocation is to be tracked and invoiced separately from the other work due to the grant funding source requirements. The Project proposes a new permanent fire station for the Santa Rosa Fire Department that meets the latest design standards for fire safety to provide maximum fire resilience. Note: See Performance Criteria in the Design-Build RFP attachment for extensive scoping and other project description information. The construction estimate range is $15.6M to $18M This team is to be independent of the Design-Build Entity and this team shall not be connected with the selected Design Builder. As it is a parallel process, the City has retained the following consulting firms to provide technical materials. These firms are prohibited from responding to this procurement, joining any Design-Builder, or otherwise assisting with this procurement process: 1. Skanska 2. RossDrulisCusenbery Architecture, Inc. 3. Tom Origer & Associates 4. MIG, Inc. 5. Ninyo & Moore Geotechnical & Environmental Services Consultants 6. BKF Engineers 7. W-Trans 8. Cumming 9. The Design-Builder selected to provide design and construction of the project,

Post-Bid

Fire / Police

$16,800,000.00

Public - City

LEED Certification, Outdoor Lighting, Paving, Renovation, Site Work

19

11

2

2

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
50
Bidding Soon
1,251
All Active Projects
528
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

June 1, 2023

img_map_placeholder

1400 Fountaingrove Pkwy, Santa Rosa, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.