Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, outdoor lighting and renovation of a mixed-use development in Santa Rosa, California. Completed plans call for the renovation of a fire / police facility.
This project is the child project to Fire Station 5. It is seeking an agency construction management and inspection position as stated below. The scope of services should include, at a minimum, Agency Construction Management and Construction Inspection as defined and described in the American Public Works Association (APWA) publication titled, "Management of Public Works Construction Projects". Your management and inspection services shall be in general conformance with the APWA publication, or other infrastructure industry publication with comprehensive guidelines for management and inspection of Public Works projects that is acceptable to the City. Requested deviations are to be presented in proposal and may affect the scoring of the consultant The approximately 2.11-acre project site is in the northwest portion of a larger property located at 1400 Fountaingrove Parkway (APN 173-670-022). The site is currently undeveloped and does not have a separate address listed by the City. The proposed project is called the Fire Station 5 Resiliency and Relocation Project (Project). The Project rebuilds a former fire station that was located on Newgate Court, approximately 4,000 feet northeast of the Project site which burned in 2017 Tubbs Fires. The Project is a replacement of a temporary facility located approximately 4,000 feet southeast from the proposed Project site at 3480 Parker Hill Road. Development would occur in two areas of the parcel. The western portion of the site would be developed with a new approximately 10,763 square-foot, twostory, fire station essential services building. At its tallest point, the fire station would be 29 feet tall. Additional ground disturbance of up to 1.9 acres of previously disturbed and developed public right of way adjacent to the site for utility connections, and intersection and frontage improvements is also proposed. On the east side of the site (in the panhandle), a paved parking lot with approximately 20 spaces would be developed. Trees and landscaping destroyed by the Tubbs Fire would be removed. Other proposed improvements to support the new fire station include road median and striping improvements, light signalization changes, and relocation of an aboveground PG&E transformer. The existing aboveground PG&E transformer is located the west side of the site along Fountaingrove Parkway. This transformer serves the AT&T Switch Gear Building south of the site, along the existing gravel access road. Project construction would necessitate moving the transformer to a location yet to be determined by PG&E. AT&T and PG&E infrastructure is located underground at the proposed new fire station site and will need to be relocated. Work for utility relocation is to be tracked and invoiced separately from the other work due to the grant funding source requirements. The Project proposes a new permanent fire station for the Santa Rosa Fire Department that meets the latest design standards for fire safety to provide maximum fire resilience. Note: See Performance Criteria in the Design-Build RFP attachment for extensive scoping and other project description information. The construction estimate range is $15.6M to $18M This team is to be independent of the Design-Build Entity and this team shall not be connected with the selected Design Builder. As it is a parallel process, the City has retained the following consulting firms to provide technical materials. These firms are prohibited from responding to this procurement, joining any Design-Builder, or otherwise assisting with this procurement process: 1. Skanska 2. RossDrulisCusenbery Architecture, Inc. 3. Tom Origer & Associates 4. MIG, Inc. 5. Ninyo & Moore Geotechnical & Environmental Services Consultants 6. BKF Engineers 7. W-Trans 8. Cumming 9. The Design-Builder selected to provide design and construction of the project,
Post-Bid
Fire / Police
$16,800,000.00
Public - City
LEED Certification, Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2023
June 1, 2023
1400 Fountaingrove Pkwy, Santa Rosa, CA
Related To This Project
Santa Rosa, CA
Bid Date: Mar 29 2023
Santa Rosa, CA
Bid Date: Mar 02 2023
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Feb 13 2023
Santa Rosa, CA
Bid Date: Mar 17 2020
Santa Rosa, CA
--
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Feb 10 2023
Santa Rosa, CA
--
Santa Rosa, CA
Bid Date: Mar 03 2023
Santa Rosa, CA
Bid Date: Feb 16 2023
Santa Rosa, CA
Bid Date: Mar 29 2023
Santa Rosa, CA
Bid Date: Feb 03 2023
Santa Rosa, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.