Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 24, 2025 at 8:00 PM
Updated April 25, 2025
Site work and paving for a civil project in Bellevue, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The work, in general, will include the approximate quantities and items listed below: 19,500 SY-Remove Remove Pavement Pavement 9,000 LF Concrete Curb and Gutter Remove and Replace 6,500 CY Roadways Common Excavation. Question Deadline 03/14/2025 Contact information and submittal procedures for such questions are as follows: A. Mike Kaster, P.E., at the office of the Engineer: Cedar Corporation. Office Phone: (920) 785-7301. Email: mike.kaster@cedarcorp.com o 12,000 CY Pond Common Excavation, 5,000 CY Crushed Aggregate Base Course 21,000 SY-Hot Mix Mix Asphalt Paving 4,500 SY-Concrete Driveways 6,000 CY-Base Course Stabilization 500 LF-Underdrain orm Sewer 700 LF-48 RCP Storm Sewer 660 LF-42 RCP Storm Sewer 700 LF-30 RCP Storm Sewer 300 LF Bursting 800 L 0 LF-12 RCP Inlet Lead 1,100 LF-15"" Storm Sewer 20 EA-Concrete Manholes 28 EA-Concrete Inlets o Structure Adjustments o Erosion Control o Landscape Restoration 30 Storm Sewer, Pipe oTraffic Control Prequalification of Bidders is required. Each proposal shall be accompanied by a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to five percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. When submitting an electronic bid, Bidder is required to deliver the original bid bond within 72 hours of bid opening to Cedar Corporation. The Village of Bellevues Bidders Proof of Responsibility forms shall be completed, submitted and received by the Owner by 4:00 p.m., a minimum of five (5) calendar days prior to the Bid Opening. Bidders who have been previously qualified for a Village of Bellevue project during 2024/2025 will not be required to resubmit separate qualifications for this project. No bids will be accepted from any Bidder who has not submitted the Village of Bellevues Bidders Proof of Responsibility. The Owner reserves the right to reject the Bid of any Bidder who has been determined to be unqualified. Proposals shall not be withdrawn for a period of 60 days after the date of opening. The Village of Bellevue reserves the right to reject any or all of the proposals and to waive any informalities therein.
Award
Roads / Highways
$3,055,319.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2025
May 19, 2025
Industrial Dr & Sal St, Bellevue, WI
Related To This Project
Bellevue, WI
Bid Date: Mar 20 2024
Bellevue, WI
--
Bellevue, WI
--
Bellevue, WI
Bid Date: Dec 09 2025
Bellevue, WI
--
Bellevue, WI
Bid Date: Aug 13 2024
Bellevue, WI
Bid Date: Feb 28 2024
Bellevue, WI
Bid Date: Feb 21 2024
Bellevue, WI
Bid Date: Jan 09 2024
Bellevue, WI
Bid Date: Nov 01 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
