Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a clubhouse / community center in Becker, Minnesota. Completed plans call for the renovation of a clubhouse / community center.
Furnishing of all labor, materials, and all else necessary for the following: Becker Community Center AHU Replacement Project In general and pursuant to Minnesota Statutes, chapter 429, the work consists of the construction of HVAC Equipment with approximately the following quantities: o Demolition of 2 indoor air handling units o Demolition of 2 outdoor DX Condensing Units o Provide 1 new indoor air handling unit o Provide 1 new outdoor DX Condensing unit o Provide 2 new Variable Air Volume boxes o Ductwork and piping modifications o Provide new DDC controls o Provide electrical modifications to accommodate mechanical changes. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor.
Bid Results
Clubhouse / Community Centers
$433,700.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2023
March 20, 2023
11500 Sherburne Ave, Becker, MN
Related To This Project
Becker, MN
Bid Date: Feb 28 2023
Becker, MN
Bid Date: Mar 22 2023
Becker, MN
Bid Date: Apr 04 2023
Becker, MN
Bid Date: Aug 21 2023
Becker, MN
Bid Date: Apr 14 2020
Becker, MN
Bid Date: Feb 14 2023
Becker, MN
Bid Date: Sep 20 2022
Becker, MN
Bid Date: Sep 01 2022
Becker, MN
Bid Date: Jun 14 2022
Becker, MN
Bid Date: Aug 11 2022
Becker, MN
Bid Date: Jun 30 2022
Becker, MN
Bid Date: Apr 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.