EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 1, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Collegeville, Pennsylvania. Completed plans call for the renovation of a educational facility.

A. The owner has contracted with the following companies for work relating to this project: 1. Spitz Inc. for the design and installation of the dome and all its associated specialty equipment. They will also be removing the existing dome and equipment. 2. Essjay Co., LLC for the installation of Irwin planetarium Seating. B. Cooperate fully with Owner and his work force, so work may be carried out smoothly, without interfering with or delaying Work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner. Arcola Planetarium for the Methacton School District It is intended to award multiple prime contracts for the work as follows: Contract No. 1General Construction Contract No. 2HVAC Construction Contract No. 3Electrical Construction The share link will be provided when payment is received. Additional project information available at electronically Project information is available at portal Each Bid must be accompanied by a Certified Check, money order or cashieraEUR(TM)s good faith check payable to Methacton School District or Bid Bond in an amount not less than 10 percent (10%) of the total bid, as security. Performance and Payment Bonds are required. Each Bid must be accompanied by a Non-Collusion Affidavit in the form set forth in the Bidding Documents. The right to waive any informality in any Bid, to reject any or all Bids or to award any Contract in the best interest of the Owner is reserved. Bidders on this Work and all subcontractors shall comply with all provisions of the Pennsylvania Prevailing Wage Act. Bidders on this Work and all subcontractors shall comply with all provisions of the Pennsylvania Commonwealth Procurement Code for Prevention of Environmental Pollution All questions must be submitted in writing by e-mail as follows. Phone calls are not permitted. 1) All questions must be sent to: KCBA Architects Mark Marella mark.marella@kcba-architects.com 2) MPE Engineering questions should also be copied to: Moore Engineering Inc. Ken Kauffman (Mech) kenk@mooreengineering.com Tracy Thomas (Elec) tracyt@mooreengineering.com Bid Results General Contract Bid Walter Brucker & Co, Inc - $101,500 Mechanical Contract Bids Hirschberg Mechanical LLC - $139,475 Electrical Contract Bids S & S Electrical Services, Inc - $153,778

Bid Results

Educational

$394,753.00

Public - County

Renovation

17

23

5

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Allowances, Quantity Allowances, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Wood Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Pillows, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers, HVAC Fans, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
240
Bidding Soon
3,807
All Active Projects
1,793
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2023

March 13, 2023

img_map_placeholder

4001 Eagleville Rd, Collegeville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Arcola Planetarium

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.