Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 23, 2023

March 27, 2023

August 31, 2023

Award

Roads / Highways

$207,508.00

Public - City

Paving, Site Work

img_map_placeholder

Multiple Locations, Collegeville, PA

3

20

4

8

Subscribe to View Full Documents

Site work and paving for a road / highway in Collegeville, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 19, 2023, Project has been awarded. Award amount is $207,508.75** For 2023 Collegeville Paving Program This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry. This project is also subject to Act 127 of 2012, known as the Public Works Employment Verification Act which requires all public work contractors and subcontractors to utilize the Federal Government's E-Verify system to ensure that all employees performing work on public work projects are authorized to work in the United States. The successful bidder will be required to furnish a bond guaranteeing performance of the contract in the amount of 100% of the value of the contract. A certified check or bid bond for the amount of 10% of the total bid shall be required. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. Letters of credit will not be accepted. The Borough of Collegeville reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any immaterial defect or informality in the bids. Quantities are not guaranteed and may vary (+/-). Scope- Milling of 1.5" of Asphalt and the Addition of 1.5" Superpave Mixture Design 9.5mm (0.3-3 million ESALS) PG 64S-22 that meets the current PennDOT PUB 408 specifications at the time of installation of the following roads and approximate lengths [Maintenance and Protection of Traffic is considered incidental to this work]: o Stratford Ave - 9,423 SY o E. Ninth Ave - 2,238 SY o Existing asphalt rolled curb (approx. 160 LF) replacement shall be replaced in kind, incidental to the milling and paving of E. Ninth Ave. Perform base repairs on portions of Stratford Ave and E. Ninth Ave utilizing the procedure below: o Base repairs shall be performed after the milling of the existing pavement surface of the road has been completed. o A loaded materials truck will proof roll the milled surface by driving over the surface. o Prior to application of bituminous courses, existing base courses shall be reviewed by the Owner's representative for defects such as fracture, cracking, or other signs of base failure, or potential failure. All areas of failure or potential failure shall be removed by saw cutting or milling machine (jackhammer corner areas only) and replaced. An inspector, on behalf of the Borough, will mark out areas that require base repair. o Base repairs involve all labor, material and equipment for the excavation below the existing grade after the surface milling is completed to a depth of 3 inches, compaction of subgrade and installation of a three (3) inch depth of Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 25 mm Mix that meets the current PennDOT PUB 408 specifications at the time of installation. Scratch/Leveling Course: o Payment will be made at the Unit Price listed on the Unit Price Schedule of Bid Items for work actually completed as measured in the field. This price and payment will constitute full compensation for furnishing all labor, material and equipment for the furnishing and installing the scratch/leveling course of Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 9.5mm Mix that meets the current PennDOT PUB 408 specifications at the time of installation at locations as directed by the Owner. The scratch/leveling course is an estimated quantity that may or may not be used on the project. The scratch/leveling course if required by the Owner shall be installed after the milling of the existing pavement surface of the roads has been completed and all base repairs have been completed. Installation/replacement concrete sidewalk at ADA Ramp at Stratford Ave and Clahor Ave o Construction stakeout of the curb ramp at Stratford Ave and Clahor Ave will be provided by Gilmore & Associates, Inc. The Contractor will be responsible to coordinate the scheduling of the construction stakeout required for the curb ramp with Gilmore & Associates, Inc. after the preconstruction meeting. (NO MORE THAN 70% PAYMENT WILL BE CONSIDERED FOR THIS ITEM UNTIL SUBSTANTIAL GRASS GROWTH HAS BEEN ESTABLISHED IN THE DISTURBED ADJACENT AREAS) Installation/replacement concrete curb at ADA Ramp at Stratford Ave and Clahor Ave NOTES: o Construction stakeout of the curb ramp at Stratford Ave and Clahor Ave will be provided by Gilmore & Associates, Inc. The Contractor will be responsible to coordinate the scheduling of the construction stakeout required for the curb ramp with Gilmore & Associates, Inc. after The preconstruction meeting. Installation of Detectable Warning Tiles at ADA Ramp at Stratford Ave and Clahor Ave Replacement of concrete sidewalk at bridge location Stratford Ave Replacement of concrete sidewalk at bridge locations Clahor Ave Replacement of 6 ft Inlet Hood and Grate Stratford Ave Replacement of 4 ft Inlet Hood and Grates Stratford Ave Replacement of concrete driveway apron Stratford Ave and Avon Ave (4 locations) Replacement of driveway depressed curbing Stratford Ave (8 locations) Replacement of 4 ft Inlet Hood and Grate E. Ninth Ave Replacement of driveway depressed curbing along E. Ninth Ave Thermoplastic Line Striping / Pavement Markings at Crosswalk E. Ninth Ave

49 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
746
Active Projects
454
Bidding Soon

Related Projects


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.