BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2023 at 8:00 PM

Updated January 27, 2024

Site work for a civil project in West Chester, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

As of March 21, 2023, this project has not yet been awarded. The project is expected to be awarded tonight. CADD FILE 2103560007 The project consists of the replacement of an existing 5-foot diameter riveted steel pipe under a portion of Bolmar Street approximately 408-feet Northwest of its intersection with Autopark Boulevard. The existing culvert will be replaced with twin 58 x 91-inch elliptical concrete pipes and two (2) new concrete end walls. A portion of the existing gravity sanitary sewer and public water main will also be replaced as part of this project. Each bid must be accompanied by a certified check drawn to the order of West Goshen Township, or a Bid Bond in favor of West Goshen Township in the amount of 10% of the bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, must be paid to workmen employed on this project. No bid may be withdrawn within sixty (60) days of the date of the bid opening. West Goshen Township reserves the right to reject any and all bids and to waive any bidding informalities.

Bid Results

Bridges / Tunnels

$836,905.00

Public - City

Site Work

28

20

9

6

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
686
Active Projects
295
Bidding Soon
4,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2023

March 20, 2023

Project location map

S Bolmar St & Autopark Blvd, West Chester, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.