BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Matawan, New Jersey. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The scope of work generally includes the following: 1. Matawan Pump Station: a. Replace existing automatic transfer switch and main service circuit breaker. b. Replace incoming service electrical feeder from Utility Pole to new service switch. c. Provide new power monitoring system connected to the SCADA system. Monitoring system to measure voltage and current for both the generator and incoming service. d. Replace the existing 75 kVA transformer serving the facility lighting panels. e. Remove the existing manlift and all associated conduit, wiring and appurtenances. Infill the floor slab on the main and intermediate floor levels after removal. f. Provide bypass pumping for the entire duration of the service replacement. g. Provide a standby generator to provide power to the station in the event of a bypass pump failure. 2. West Keansburg Pump Station a. Replace existing automatic transfer switch in existing MCC lineup. b. Provide new power monitoring system connected to the SCADA system. Monitoring system to measure voltage and current for both the generator and incoming service. c. Provide bypass pumping for the entire duration of the service replacement. d. Provide a standby generator to provide power to the station in the event of a bypass pump failure. Provide all required appurtenant WORK shown on the Contract Drawings or indicated in the Contract Specifications The work to be performed under this Contract is located at the Bayshore Regional Sewerage Authority Matawan Pump Station site at 60 Main Street, Matawan, Monmouth County, New Jersey and West Keansburg Pump Station site at 13 Tenth St, Keansburg, Monmouth County, New Jersey. A description of the work is included in this Section of the specifications. This description generally defines the work to be undertaken on this project and is to be supplemented by the remaining Contract Documents. Under no circumstance shall this summary of work be used to limit the work to be performed by the Contractor. Contractor shall deliver a complete and final product to the Authority and all work required whether implied, suggested or otherwise necessary to deliver a complete and functional project shall be deemed included within the Contractor's scope. C. The Contractor is to furnish all labor, materials and equipment required for the complete project and related construction for the bid price. The work is to be coordinated by the Contractor with the Authority, Engineer, Utilities and, as necessary, third parties

Award

Water / Sewer

$625,350.00

Public - City

Renovation, Site Work

14

16

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
939
Active Projects
514
Bidding Soon
7,253
All Active Projects
3,098
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 1, 2023

March 31, 2023

May 4, 2024

img_map_placeholder

Multiple Locations, Matawan, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.