BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a residential development in Shawnee, Oklahoma. Working plans call for the construction of a residential development; and for site work for a residential development.

As of March 16, 2023, the owner has selected a design builder. FY21 HUD-ICDBG Project (Award #21GC4016240) NEW HOUSING CONSTRUCTION - New Home Construction Project Location: Village West, Shawnee, Oklahoma (off Highway 177 and Coker Road) The Housing Authority of the Kickapoo Tribe of Oklahoma (HAKTO) proposes building two new rental homes that will be leased with the option to purchase (LWOP) for low to moderate income tribal members in the HAKTO's newest subdivision of West in Shawnee, Oklahoma. The homes have road access, water and electricity on site and will be on aerobic septic systems. The square footage of these two homes will be determined through design. The fixed-price Design-Build contract is estimated to be under $650,000 and will be completed by May 15, 2024. This project is federally funded by a United States Department of Housing and Urban Development (HUD) Indian Community Development Block Grant (ICDBG). The project will be inspected by the U.S. Army Corps of Engineers-Tulsa District. The Corps will also review pay applications for the Owner's recommendation to pay. Selection of a Design-Build team will be evaluated on the following criteria: 1. Architect's/Engineer's qualifications. 0-20 points 2. General Contractor's experience, superintendent's experience, and qual-ity control of project. 0-30 points 3. Design-Build team's experience contracting with tribal governments. 0-10 points 4. Plan to hire local Indian labor and minority subcontracting. 0-10 points 5. Proposed design-build completion schedule. 0-5 points 6. Design-Build lead registered on SAM.gov. 0-5 points 7. Verifiable Indian Preference of A&E and GC (proof of tribal enrollment and/or majority company ownership if claiming Indian owned business). 0-10 points 8. Proof of existing business insurance and ability to 100% bond payment and performance. 1-10 points. A 100% payment and 100% performance bond will be required at the time of contracting at 30% design. A Certificate of Liability Insurance for the contract price, naming the Kickapoo Housing Authority as a certificate holder or additional insured, will also be required at contracting. The Design-Build lead must be registered online prior to contracting with no exclusions. Contractor will make all reasonable attempts to hire minority subcontractors and/or Indian-owned businesses. Contractor will hold a local job fair, report monthly progress to Owner with a photo log, and have a superintendent on site during all construction. This is a Request for Qualifications only. There is no site showing and additional questions will not be taken at this time. The HAKTO will proceed to a 30% design phase with a responsive and qualified Design-Build team based on the information contained in the RFQ packets. The HAKTO reserves the right to select a D-B team with or without conducting interviews.

Pre-Construction/Negotiated

Residential Subdivision

$650,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
70
Bidding Soon
999
All Active Projects
460
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 4, 2023

October 4, 2023

May 15, 2024

img_map_placeholder

Highway 177 and Coker Road, Shawnee, OK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.