BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Fontana, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The City of Fontana is accepting proposals from qualified Civil Engineering firms, with experience in Caltrans Oversight and Encroachment Permit projects, to provide Engineering Design Services for the Development of Plans, Specifications and Estimates and other Engineering Services for the Citrus Avenue Widening at SR-210 Project. Design Consultant will be responsible for coordinating any design and permit requirements with Caltrans. The Consultant shall refer to Section 1.2 and 1.8 of this RFP for additional information regarding the City's expectations for Caltrans coordination. All work associated with this project shall conform to the City's standard plans, Caltrans requirements and Greenbook specifications, including any amendments made by the City or Caltrans. The City intends to improve the traffic flow on Citrus Avenue by widening the street segment between the SR-210 eastbound on-ramp intersection and South Highland Avenue. The widening will take place on the east portion of Citrus Avenue and will add a dedicated right-turn lane onto eastbound SR-210, between the SR-210 eastbound on-ramp intersection and South Highland Avenue. This widening will impact adjacent traffic signals and curb ramps, thus modifications and/or relocations will be required where proposed improvements impact existing conditions. These modifications and/or relocations shall include any storm drain improvements in the project area. In addition to adding a right-turn lane, the project shall include a reconfiguration of the existing median to extend the length of the southbound left turn pocket on Citrus Avenue, between the SR-210 eastbound ramp intersection and South Highland Avenue. The consultant shall be aware of ongoing development, scheduled to occur in 2023/2024, on the northwest and northeast corners of the Citrus Avenue and South Highland Avenue intersection. Therefore, design and construction of this project is imperative to support future traffic conditions. Online Q&A Yes Q&A Deadline 02/11/2023 2:43 PM (PST) Pre-Bid Meeting No Bid Valid 90 Days Start/Delivery Date March 2023 Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Response Format Electronic Project Type RFP (Request for Proposal) Type of Award Lump Sum The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
117
Bidding Soon
2,173
All Active Projects
1,012
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

img_map_placeholder

Citrus Ave and SR-210, Fontana, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.