BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Lexington, Alabama. Completed plans call for the renovation of a 4,135-square-foot educational facility.

For Awnings/Canopies at the following sites; 1.Lexington High School 2.Waterloo High School 3.Wilson Elementary School A Pre-Bid Conference will be not be held. Questions from contractors may be directed to Mr. Mark Waddell at 256- 760-1300. Bid packets may be emailed upon request by contacting the Lauderdale County Board of Education, 355 County Road 61 Florence, Alabama 35634, at 256-760-1300. Bids should be placed in a sealed envelope clearly marked on the outside of the envelope. Lauderdale County Board of Education reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. The Lauderdale County Board of Education is an EEO/AA employer and any successful bidder will be required to comply with applicable federal and state laws and executive orders. 1. Details for each site are listed below. 2. The three sites are; a. Lexington High School, b. Waterloo High School, c. Wilson Elementary School 3. Provide all labor, materials, equipment and services required to complete installation of walkway coverings as indicated. 4. Comply with manufacturer's instructions and recommendations for installation. 5. Set plumb, level, and true to line, without warp or rack of framing members or panels. Anchor securely in place. 6. Awning/Canopy shall consist of heavy duty aluminum flat panel roof covering of at least .032 mil, and minimum 3 inch extruded poles. 7. Poles must be used as concealed downspouts for drainage of water from facia/gutter. 8. Poles shall be anchored to the concrete sidewalk as much as possible, or concreted into the ground. Where canopy can be attached to the building, poles will not be required. But recommended if needed. 9. Poles and roof panels shall be white in color. 10. Fasteners shall be heavily galvanized or cadmium plated. 11. Brackets, accessories, trim shall be provided and match primary members, as required for a complete cover installation. 12. Clean completed system promptly after installation. Remove excess sealant compounds, dirt and other substances from aluminum surfaces. 13. Supply manufacturer's standard literature and specifications for canopies. 14. Owner will be responsible for demolition and removal of old awnings.

Award

Educational

$122,630.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
26
Bidding Soon
449
All Active Projects
193
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2023

March 23, 2023

img_map_placeholder

Multiple Locations, Lexington, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.