BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Boston, Massachusetts. Contact the soliciting agency for additional information.

The selected contractor shall furnish all labor, materials, equipment, parts, machinery, transportation, and supplies services necessary for generator maintenance at the locations listed. The work will include both scheduled and short-notice emergency services. Further requirements are specified below. The selected contractor shall furnish all materials, equipment, labor, and the selected contractor shall inspect, and service equipment listed in accordance with the specifications herein. The selected contractors shall submit a detailed preventative maintenance (PM) program proposal outlining all the task that willbe performed at each service interval, including pricing. All work performed on generators will carry a one-year, unconditional warranty on parts and labor. All replacement parts shall be new and of the same quality and brand name as those being replaced. Any repair service above and beyond preventative maintenancewill require an estimate being submitted to the EDIC Authorized Representative. Repair work must be of an acceptable level in terms of cost, time and workmanship. All work must be performed in such a manner as not to inconvenience building tenants. The selected contractor shall secure any and all permits, inspections and licenses necessaryfor the execution of the work. Duplicates of all service records for any maintenance, repair or testing should be attached to invoices sent to EDIC. The selected contractor shall do all the work and furnish all the materials, tools, equipment and safety devices necessary to perform the needed work. The selected contractor shall at his own expense, wherever necessary or required, furnish safety devices and take such other precautions as may be necessary to protect life and property. Scheduled semi-annual maintenance will be performed during the contract term as well as two 2-hour annual load bank tests. Thursday, January 26, 2023 Submit Questions Tuesday, January 31, 2023 BPDA Response

Final Planning

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
150
Bidding Soon
2,673
All Active Projects
1,113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.