BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2023 at 7:00 PM

Updated January 29, 2024

Site work and paving for a road / highway in Molino, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

On September 16, 2020, Hurricane Sally made landfall as a Category 2 storm in Gulf Shores, Alabama. Because Escambia County, Florida is on the east side of, and directly adjacent to, the landfall location, significant damages to the existing infrastructure occurred. As a result of these damages, Escambia County is requesting engineering services to design and implement the repair of these damages, consistent with the requirements for FEMA reimbursement for a location on Brickyard Road. The Method of Contractor Selection has not been Determined at this time

Conceptual

Roads / Highways

$2,000,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
65
Bidding Soon
790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.