BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work, paving, new construction and renovation of an educational facility in Beltsville, Maryland. Design plans call for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for paving for a educational facility.

The existing High Point High School will be replaced with a new, state-of-the-art 423,000 square foot facility built on the current site, designed to accommodate 2,600 students. The project will address overcrowding and provide modern learning environments supporting 21st-century instruction, including updated core spaces, enhanced safety features, energy-efficient systems, and dedicated areas for career and technical education. pgcps Despite the formal project name referencing "renovation," this is a full replacement — a complete tear-down and rebuild on the existing Powder Mill Road campus. Grimm + Parker Architecture has been selected as the project architect. The Calverton, MD-based firm is one of Maryland's most active K–12 education architects and has a substantial prior portfolio with PGCPS and other Maryland school systems. The general contractor has not yet been selected — the GC/CM procurement will follow once design progresses sufficiently through the Maryland state review and approval process. The project is currently shown in the Design Phase on PGCPS's Capital Programs project tracker, with the most recent community update meeting held on February 18, 2026, for which recordings and multilingual presentations (English, Spanish, and French) are publicly available on the PGCPS Capital Programs website. A prior update was held April 9, 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Educational

$189,000,000.00

Public - County

New Construction, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
7
Bidding Soon
1,794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

3601 Powder Mill Rd, Beltsville, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.