BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

All prospective bidders are encouraged to contact the buyer, Joyce Baker at joyce.baker@houstontx.gov for any questions regarding this solicitation. Questions From Bidders Due to COH 01/30/2023 10:00 Am CST Notification of Award (Estimated) 02/10/2023 1.1 Prep all areas in Lot 1 and Lot W 1.2 Pressure wash / re-stripe all parking line and loading zones 1.3 Pressure wash / re-stencil all handicap logos 1.4 Pressure wash / re-stencil arrows 1.5 Pressure wash / re-stencil all specialty stencils 1.6 Power wash / re-stripe 6" fire lane 1.7 Re-stencil "FIRE LANE" & "NO PARKING" onto fire lane 1.8 Pressure wash / re-stencil numbers in Lot 1 and Lot W 1.9 Three business days prior to performing re-striping services, the Contractor, shall contact the designated City of Houston representative to confirm date and time of services to be performed. 1.10 The Houston Permitting Center is open to the public during regular business hours Monday - Friday (8 AM -5 PM), excluding City of Houston holidays. Pressure washing must be provided after 6 PM on Friday and re-striping done on Saturday for both Lot 1 and Lot W. 1.11 While the City does not allow employees to park in Lot W after 5:00 PM; Lot W is open to the public after 5:00 PM, so there may be vehicles parked in the lot. Pressure washing and re-striping services will need to be coordinated with the Houston Permitting Center designated representative for this area. Lot W is usually vacant between 1:00 AM and 6:00 AM (weekdays) and this is a possible option the Contractor can discuss with the Houston Permitting Center representative. 1.12 The Houston Permitting Center Lot 1 is under 24-hour security. 1.13 Contractor will be required to notify the security desk within the building upon arrival to perform services. 1.14 The Contractor shall provide a supervisor or foreman who will: 1.14.1 Communicate effectively both orally and in writing with the designated COH representative. 1.14.2 Always be present during contract operations. 1.14.3 Complete all prep work to parking lots Friday after normal business hours. 1.14.4 Complete all paint work the next day (Saturday). 1.15 The Contractor shall accommodate any direction or communication given to the foreman that is within the scope of this contract. 1.16 City trash bins shall not be used for debris disposal. 1.17 The Contractor shall dispose of all refuse and debris collected during pressure washing and re-striping to a legally established landfill. The cost of disposal and dump fees shall be included in the cost of the standard service rate. 1.18 The Contractor shall notify the COH designated contact person of any obstruction and/or reason why pressure washing, or re-striping could not be performed. Verbal reports must be followed with written notification to include a method/plan of resolution. All delays/obstructions must be reported within 24 hours of discovery/occurrence. 1.19 Care and precautions shall be used when using equipment around or near vehicles parked in lot while performing services. 1.20 All equipment shall be adequately maintained both mechanically and visually and be fully operational during all the performance of the scope of work listed. 1.21 The Contractor shall use all reasonable methods to minimize dust emissions during the performance of services requested with this contract. The Contractor shall comply with all City and County sound control and noise level rules and regulations and ordinances applicable to any work performed. 1.22 The Contractor must furnish all water required for the performance of this work. While pressure washing or re-striping, vehicles (if used) shall be equipped with top-mounted warning lights and have 360-degree visibility or comparable traffic safety lights and meet all the applicable codes required in the State of Texas. 1.23 The Contractor shall conduct thorough background investigations of each employee working during this one-time service. 1.24 The Contractor shall provide trained operators to minimize disruption of service. 1.25 The Contractor shall ensure that all personnel know proper work procedures and have personal protective equipment to work safely. 1.26 The Contractor shall provide uniforms and name badges that display the company name for all personnel during the performance of work.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.