BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2023 at 7:00 PM

Updated January 29, 2024

Renovation of a mixed-use development in Chester, New Hampshire. Completed plans call for the renovation of a educational facility.

The project includes renovations to the main office at Chester Academy. Work includes demoli-tion of existing gypsum walls, flooring, ceilings, and casework, and the construction of new steel stud walls with gypsum board. Finishes include LVT flooring, new metal frames and wood doors, a new security window with a solid surface counter, new suspended ceilings, and grid. The project includes all associated mechanical and electrical work, including fire alarm, data wir-ing, and sprinkler system. Mechanical & Electrical work will be design/build to code. Work to be completed between June 26th and August 11th of 2023. Contract Documents, including drawings and specifications for the use of bidders, will be on file for examination after Monday, February 1st, 2023 at the following locations: Office of Frank P. Marinace, Architect, P.A., 79 Main Street, New Hampton, NH Office of Superintendent of Schools, 22 Murphy Drive, Chester, NH Associated General Contractors, 48 Grandview Road, Bow, NH Construction Summary, 734 Chestnut Street, Manchester, NH Signature Digital Imaging, 880 Candia Road, Manchester, NH All bids must accompany a bid surety in the form of bid bond or bank check in the amount of 5% of the base bid. The Chester School District reserves the right to reject any or all of the bids received and to waive any formalities in the bidding. No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of bids without the consent of the Chester School District

Post-Bid

Educational

$100,000.00

Public - City

Renovation

4

10

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
464
Active Projects
203
Bidding Soon
3,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

June 26, 2023

Project location map

22 Murphy Dr, Chester, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.