BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Cochrane, Alberta. Contact the soliciting agency for additional information.

The complete Proposal should be in one (1) email, including attachments, and should not be larger than 25MB to facilitate receipt by the Province. If multiple emails are required to accommodate attachment sizes, the emails should provide clear instructions on how the Proposal is to be integrated (e.g. 1 of 3, 2 of 3, 3 of 3). The official time and date of receipt of the Proposal will be determined by the email received time as recorded by the Government of Albertas email server. Proponents should be aware that, prior to such electronic delivery, incoming emails are subject to consistency checks and antivirus scans, which process can take several minutes or longer to complete. The Province will not be responsible for failures (technical or otherwise) that may result in a Proposal not being received prior to the RFP Closing Date and Time. Glenbow Ranch Provincial Park (GRPP) area is 1,314 hectares (3,335.9 acres) along a stretch of the Bow River between the City of Calgary and the Town of Cochrane (see map in Appendix A). The park area was acquired by the Alberta Government in 2006 from the Harvie Family. GRPP is a unique and diverse landscape that protects one of the only examples of Albertas rare and ecologically sensitive Foothills Parkland in the park system. The park protects an extensive range of native grassland and riparian habitats, which also supply a multitude of valuable ecosystem services to Albertans, as well as culture resources that are significant to the people of Alberta. Since inception, the Glenbow Ranch Park Foundation partnered with the Government of Alberta to guide the management of the park. Following the official designation of GRPP in 2008, an Interim Development and Management Strategy was completed in 2010 prior to the park opening to the public in 2011. Although there have been several draft plans initiated since that time, they were ultimately not completed, or insufficient. Currently, there is no a comprehensive and approved management plan for the park. A holistic and comprehensive management plan has been identified as a priority and is a critical need to address the dramatic change in visitor use expected in the next five years. The project will support Alberta Parks in the development of a management plan for Glenbow Ranch Provincial Park. Visitor use within Glenbow Ranch Provincial Park (GRPP) will change dramatically in the next five years due to land use developments on three sides of the park including: the new Haskayne Park in the City of Calgary; a bridge over the Bow River to Cochrane, and future approved residential development within Rocky View County. It is anticipated that visitor use could increase from 144,000 visits per year to well over a million once these trail connections are established. Proactive planning for facility and natural resource management will put Alberta Parks in a position of readiness and ensure the parks infrastructure and natural resources are effectively developed and protected to meet the needs of this anticipated growth. This project will assess essential park infrastructure improvements required to ensure public safety, protection of critical habitats, and to provide a high quality visitor experience. Core deliverables of this contract will include a trails and facilities site assessment, and strategic engagement and communications plan to guide the engagement of Indigenous peoples, the public and key stakeholder within the subsequent management planning process: The pathways, trails and facilities site assessment will provide important contextual information about the potential impacts and mitigation strategies needed to effectively manage a significantly higher visitation volume. The strategic engagement and communications plan will identify the appropriate communities and stakeholder groups needed to inform the development of the management plan, champion the implementation of the plan, or who may provide new resources and capacity through not-for profit or private sector partnership initiatives. The method of contractor selection has not been determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
11
Bidding Soon
314
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

img_map_placeholder

Glenbow Rd, Cochrane, AB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.