Site work for a water / sewer project in Johnstown, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Projects includes the following Work: The installation of approximately 19,000 LF of 02", 04", 10", and 12" water line, 60 water service connections, five (5) pressure reducing valve (PRV) vaults, and associated water appurtenances. The Contractor shall be responsible to furnish all labor, materials, and equipment necessary to complete the Work as shown in the Contract Documents. The Owner shall procure the pipe, water related materials, PRV vaults and appurtenances for the Work. A detailed list of procured materials is provided in the Contract. The Work is in Adams and Croyle Township, Cambria County, Pennsylvania. The Issuing Office for the Bidding Documents is: The EADS Group, Inc., 450 Aberdeen Drive, Somerset, PA 15501; Contact: Ms. Kathy Paul, EADS-814-445-6551 ext. 374; kpaul@eadsgroup.com. To access the electronic version, the Bidder must have a valid email address and net connection. Upon confirmation of payment, a website link and access credentials will be emailed to the Bidder to access the Bidding Documents. For all further requirements regarding bid submittal, bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The project is locally funded. *Interested bidders must obtain their own set of documents from The EADS Group, Inc. to be eligible to bid the project. The phase 2 of the project is expected to begin August 2Ü22. Phase 2 shall be completed approximately at the end of 2023. Biddershall submit all questions about the meaning or intent ofthe BiddingDocumentsto Engineer in writing. Contact informatiott and submittal procedures for such questions, ate as follows; A. Name: Jeffrey M. Najjar, P.E., The EADS Group. Inc C. Address-. 450 Aberdeen Drive, Somerset. PA 15501

Award

Water / Sewer

$1,988,672.00

Public - City

Site Work

65

26

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Multiple Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Air Distribution, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Landscape Grading, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
105
Bidding Soon
906
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2023

March 23, 2023

img_map_placeholder

Multiple Locations, Johnstown, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase 2 Water System Improvement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.