EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in San Antonio, Texas. Completed plans call for the renovation of a 20,060-square-foot educational facility.

Package 1 Pre-Bid RFIs Due: Feb 6, 2023, at 5:00 PM CST Expected Start: Jun 26, 2023 Expected Finish: Jul 31, 2024 Project Size: 20,060 sq. ft. SCOPE includes the early procurement of the chillers, AHUs, RTUs, Split-Systems, VDFs, and electrical panels. It also includes all glazing systems, and structural & misc. steel. All other scopes will be bid at a later date. Please reference the project minimum wage rates. Please reference the project schedule and phasing plans. QUESTIONS must be submitted in writing no later than 5:00pm on February 6, 2023. Email to adelaney@bartlettcocke.com. All Small/Women/Minority/Disadvantaged Business Enterprises are encouraged to propose on the project. There will be no site-walk or pre-bid meeting for this bid package. If you already have started and have the sub qualification form filled out, we request that it be updated yearly. Please contract myself or Phyna Rojas at 210-655-1031 / jrojas@bartlettcocke.com if you have any questions.

Post-Bid

Educational

$11,800,000.00

Public - City

Renovation

14

13

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Maintenance Data, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking
Division 08 - Openings

Division 08 - Openings

Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Cleaning Devices
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
42
Bidding Soon
1,963
All Active Projects
676
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

June 26, 2023

img_map_placeholder

1300 Delgado St, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.