BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Flagstaff, Arizona. Working plans call for site work for a water / sewer project.

The owner has selected a Construction Manager. A timeline for construction has not yet been established.” 111The District is seeking Statements of Qualifications (SOQs) for Construction Manager at Risk ("CMAR") services for improvements for construction of channel improvements, alluvial fan restoration, low-water road crossings and utility protection practices on federal lands in the Pipeline Fire burn and flood areas. The goal of the work is to reduce sediment sourcing and transport from destabilized channels and alluvial fan areas while restoring watershed hydraulic processes. It is expected that construction will begin in April of 2023 and be substantially completed by Fall of 2024. Some activities may extend into 2025 if required. Schultz/Pipeline Flood Mitigation Project - On-Forest Watershed Restoration Construction includes channel and alluvial fan restoration, construction of armored low-water crossings on forest service low maintenance roads, clearing and disposal of both live standing and dead trees, revegetation with native grasses, placement of erosion control products and limited placement of concrete to protect utilities. Harvesting and use of native materials, boulders, soil, trees will be required to achieve project goals and budget limitations. Close cooperation with the design engineer to manage the project with respect to availability and quality of these materials is required.

Pre-Construction/Negotiated

Water / Sewer

$2,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
72
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

October 12, 2023

img_map_placeholder

Multiple Locations, Flagstaff, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.