Site work and new construction of a water / sewer project in Bradshaw, Nebraska. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
** As of March 20, 2023 , this project has been awarded to Maguire Iron Inc.** For furnishing all equipment, labor, materials and appurtenances required to construct a 75,000-gallon single pedestal elevated water storage facility, water main, and other such work as may be incidental to ELEVATED WATER STORAGE FACILITY. The Owner reserves the right to reject any or all bids: and to waive irregularities or informalities to accept the BID it deems most beneficial. Bids receives received after the specified time of closing will be returned unopened. The Owners will accept only the sealed bids, either hand delivered or received via U.S. Mail or other commercial carrier. Items transmitted by facsimile or electronically will not be accepted. Each BIDDER will be required to submit with his proposal a certified check, cashiers check or bid bond made payable, without condition, to the Village Clerk, Bradshaw, Nebraska, in an amount equal to five percent (5%) of the proposal. Contractors and subcontractors on USEPA federally assisted construction projects are required to pay their laborers an mechanics wages not less than those established by the U.S. Department of Labor. A current wage decision containing the appropriate building and /or heavy type rates is included in the specifications for bidding purposes. The prospective participants must certify by submittal EPA Form 5700-49, Certification Regarding Debarment, Suspension and Other Responsibility Matters, that to the best of its knowledge and belief that it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency. BIDDERS on this work will be required to comply with the Presidents's Executive Order No. 11246. Requirements for bidders and contractors under this order are explained in the specifications Each BIDDER must fully comply with the requirements, terms an conditions of the U.S. Environmental Protection Agency, Disadvantaged Business Enterprise (DBE) requirements, including the fair share objectives for disadvantaged business participation during the performance of this contract. The bidder commits itself of the fair share objective for disadvantaged business participation contained herein and all other requirements, terms and conditions of these bid conditions by submitting properly signed bid. On January 17, 2014, H.R. 3545, "Consolidated Appropriations Act, 2014, " was enacted. Section 426 of the Act requires that none of the appropriated funds may be used for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the Untied States unless a waiver is provided to the recipient by EPA. Conditions for the waiver are found under the Information for Bidders. The term, "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flages, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction material. On November 15, 2021, the Bipartisan Infrastructure Law (BIL) (also know as the Infrastructure Investment and Jobs Act (IIJA)) was passed. Section 70901 of Public LAw 117-58, et seq., as amended, and Section 70914 (a) of the IIJA require that Federal funding for infrastructure, including Wastewater Treatment and Public Water System projects, complies with the Build America Buy America (BABA) Act. Absent a waiver, all iron, steel manufactured products, and construction materials permanently incorporated into an infrastructure project receiving BIL funding, or are a SRF Equivalency project as match for Federal funding, are subject to BABA requirements and must be produced in the United States. Conditions for the waiver are found under the Information for Bidders. The Owner is an equal opportunity employer and requires all contractors and consultants to comply with all applicable Federal and State laws and regulations. The Owner, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C 2000d to 2000-d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notified all bidders that it will affirmatively insure that in any contact entered into pursuant to the advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin, sex, age and disability/handicap in consideration for an award. Bid result : Bid A-1 - Maguire Iron - $ 886,800.00 Bid A-2 - Maguire Iron - $ 829,800.00 Bid B - VanKirk Brothers - $ 136,215.00
Award
Water / Sewer
$886,800.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2023
March 27, 2023
To Be Determined, Bradshaw, NE
Related To This Project
Bradshaw, NE
Bid Date: Dec 04 2023
Lincoln, NE
Bid Date: Feb 17 2023
Beatrice, NE
Bid Date: Apr 25 2024
Lincoln, NE
--
Omaha, NE
Bid Date: Feb 21 2023
Fairbury, NE
Bid Date: Mar 14 2023
Fairbury, NE
Bid Date: Mar 14 2023
Omaha, NE
Bid Date: Feb 15 2023
Valentine, NE
Bid Date: Feb 06 2023
Lincoln, NE
Bid Date: Mar 01 2023
Omaha, NE
Bid Date: Feb 09 2023
Omaha, NE
Bid Date: Feb 28 2023
Omaha, NE
Bid Date: Feb 15 2023
Beatrice, NE
Bid Date: Mar 02 2023
Wayne, NE
Bid Date: Feb 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.