BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a playground / park / athletic field in Toronto, Ontario. Design plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Construction of a New Park 2600 square meter located between Richmond Street West and Nelson Street, east of John Street. The winning design is called Wawatesi (Firefly in Anishinaabemowin). The scope includes planting along Richmond and Nelson Streets. A public washroom. A Balcony, which is an elevated platform to watch and perform. Also included are sustainability features such as Bioswale Planters (Green Stormwater Infrastructure), Seating Edges from Salvaged Concrete, Native Cedar Accent Tree, Natural Firefly Habitat. Balcony Structure from Low-Carbon Concrete; Fern Garden with Native & Novel Habitat for Insects; Recycled Steel Slide; Salvaged Boulders from Quarry Waste; Dense Root Systems: Birch groves planted as small trees and grow up together; Restored soil with healthy mycelium network and probiotic activity; Mycelium path made from carbon-negative concrete unit pavers; and Native understory planting attracts pollinators, birds, and small mammals. TIMELINE: Request for Proposals has been awarded by the owner. The Architectural design team design teams is led by a Landscape Architect and will provide preliminary and detailed design for the development of the new park and will work as owners' agent during the construction. Five shortlisted design teams were announced in June 2023, with the subsequent designs from each team having been submitted late Summer 2023. As of Late December 2023, the City of Toronto revealed the winner of an international design competition as the Wawatesi design. The complete team consists of West 8 Urban Design and Landscape Architecture, hcma Architecture and Design, Native Art Department International, MinoKamik Collective, ARUP, KG&A, ERA Architects and A.W. Hooker. The detailed design process and the hiring of a construction team is scheduled to take place in 2024, before construction beginning in 2025 and completion by 2026.

Design

Playgrounds / Parks / Athletic Fields

$10,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
111
Bidding Soon
2,518
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

229 Richmond St W, Toronto, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.