EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 17, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Gig Harbor, Washington. Completed plans call for the renovation of a educational facility.

Separating commons spaces from classrooms. Work includes but is not limited to: 1. Demolition, hazmat, salvage and reinstallation and cutting and patching. 2. Carpentry, hollow metal frames, doors, glazing, hardware, ceilings and paint. 3. Exit signage, fire alarm, and miscellaneous electrical. 4. Ventilation and miscellaneous mechanical. Project Location: 4905 Rosedale Street NW, Gig Harbor, WA 98335 MAIN FLOOR: 40,779 S.F Apprenticeship Estimated cost of Work is less than $1,000,000. Apprenticeship participation is not required. Prevailing Wage: It is the responsibility of the bidder to go online. Bona fide Prime Contractors may obtain a maximum of two sets and others a maximum of one set. Additional documents may also be purchaseddirectly from ARC for the cost of printing. Documents may be shipped with shipping purchased directly from ARC. A plan holder's list is also available. To be added to the plan holder's list, send an email to tacoma.bidservices@earc.com. Bid Documents may be viewed at the following Bid Documents Return: Deposits will be returned to Bidders upon return of the Bid Documents to ARC in good condition within 10 days following Bid Opening. Right to Reject: The Owner reserves the right to reject any and all bids, to waive informalities and irregularities in the bidding, and to accept bids which are considered to be in the best interests of the Owner. Withdraw of Bid: Bidders may not withdraw bids after time set for the Bid Opening, unless Award of Contract is delayed for a period of exceeding 45 days. . Commence Work On-site: June 24th, 2023 . Substantial Completion: August 14th, 2023 . Final Completion: 60 calendar days after scheduled date of Substantial Completion. Client Project: 41491.017

Post-Bid

Educational

$1,000,000.00

Public - City

Renovation

23

21

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
48
Bidding Soon
822
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

June 24, 2023

img_map_placeholder

4905 Rosedale St NW, Gig Harbor, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.