BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work and paving for a civil project in Gig Harbor, Washington. Conceptual plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

existing barriers to fish. migration at the following SR 16, and SR 302 stream crossings and replace them with fish-passable structures in compliance with the federal injunction regarding fish passages underneath WSDOT highways. Unnamed Tributary to McCormick Creek, SR 16. MP In addition, this project will remove an existing re-directional berm around the existing struc- ture crossing SR16 on Burnham Dr. Other elements including, but not limited to, surveying, earth- work, structure installation, retaining wall installation, pav- ing guardrail, stream profile realignment, streambed restora- tion, water management, erosion and sediment control, roadside planting, and traffic control. The work could also include roadside. ditches, pipes, and closed drain- age network systems to the area being added or improved upon. Engineer's Estimate: Design- Build Contract approximately $150 to $170 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Deadline for Submitting Proposer questions 06/12/2024 This Project will remove 8 existing barriers to fish migration at the following SR 16, and SR 302 stream crossings and replace them with fish-passable structures in compliance with the federal injunction regarding fish passages underneath WSDOT highways: o Unnamed Tributary to McCormick Creek, SR 16, MP 14.63 o McCormick Creek, SR 16, MP 14.65 o McCormick Creek, SR 16, MP 14.86 o McCormick Creek, SR 16, MP 14.90 o Unnamed Tributary to McCormick Creek, SR 16, MP 15.02 o McCormick Creek, SR 16, MP 15.21 o Goodnough Creek, SR 16, MP 16.59 o Goodnough Creek, SR 302, MP 16.15 In addition, this project will remove an existing re-directional berm around the existing structure crossing SR16 on Burnham Dr. Other elements including, but not limited to, surveying, earthwork, structure installation, retaining wall installation, paving, guardrail, stream profile realignment, streambed restoration, water management, erosion and sediment control, roadside planting, and traffic control. The work could also include roadside ditches, pipes, and closed drainage network systems to the area being added or improved upon.

Project Abandoned

Water / Sewer

$170,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
83
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

March 31, 2025

Project location map

Multiple Locations, Gig Harbor, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.